Published date: 18 August 2016
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
River regulation and flood control works - 45246000
Location of contract
South West
Value of contract
£200,000
Procurement reference
2016-039
Published date
18 August 2016
Closing date
23 September 2016
Contract start date
17 October 2016
Contract end date
30 November 2016
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The works will provide flood protection for residential properties adjacent to and north of Southfield Manor Park in the Charlton Kings area of Cheltenham, located approximately 2.5km southeast of the town centre.
The key element of the scheme is an earth bund/embankment and pipe connection to an existing storm water drainage system. Flood protection is provided by the creation of flood storage and the control of overland flow paths during a flood event.
The conditions of contract will be the NEC3 'Engineering and Construction Short Contract' Second Edition (ECSC2) as published for the Institution of Civil Engineers by Thomas Telford in June 2005
In accordance with The Construction (Design and Management) Regulations 2015 the Employer will be the Client, the Principal Designer will be CH2M Hill, and the Contractor will carry out the role of Principal Contractor.
More information
Attachments
-
- Water 1.pdf
- Services Water 1 - 2016-039
-
- Virgin Media 2.pdf
- Services Virgin Media 2 - 2016-039
-
- Virgin Media 1.pdf
- Services Virgin Media 1 - 2016-039
-
- 204628.002_RevD.pdf
- Rev d
-
- BT 1.pdf
- Services BT - 2016-039
-
- 204628.002.pdf
- General Arrangement Location A - 2016-039
-
- Sewers 1.pdf
- Services Sewers 1 - 2016-039
-
- Electric 1.pdf
- Sevices Electric 1 - 2016-039
-
- 204628.AL.01.00.205.pdf
- Landscape Plan - 2016-039
-
- Southfield FAS - Ecological Appraisal final.pdf
- Ecological Appraisal - 2016-039
-
- GI factual report - Sections 1 to 4 and Appendix A.pdf
- Factual Report - Part A
-
- 204628.103.pdf
- Location A Typical cross sections - 2016-039
-
- GI factual report - Appendix C and D.pdf
- Factual Report Part B
-
- Electric 3.pdf
- Services Electric 3 - 2016-039
-
- Sewers 2.pdf
- Services Sewers 2 - 2106-039
-
- Water 2.pdf
- Services Water 2 - 2016-039
-
- Gas.pdf
- Services Gas - 2016-039
-
- 204628.100.pdf
- Location A Longitudinal section of proposed embankment - 2016-039
-
- Southfield FAS - Spec CESWI7 Supplementary Clauses.doc
- Southfield FAS - CESWI7 Supplementary Clauses - 2016-039
-
- ITT responses to questions_Southfield Brook Flood Alleviation Scheme -2016 -039_Issue 3.docx
- Questions of Clarification_Issue 3
-
- Electric 2.pdf
- Services Electric 2 - 2016-039
-
- CDM Pre-construction Information_2016-039.docx
- CDM Pre-Construction Information 2016-039
-
- 204628.102.pdf
- Location B Typical cross section - 2016-039
-
- 204628.001.pdf
- Location Plan 2016-039
-
- NEC3_ITT_Southfield Brook FAS_2016-039.doc
- NEC3 ITT Southfield Brook Flood Alleviation Scheme
-
- 204628.003.pdf
- General Arrangement Location B - 2016-039
-
- 204628.101.pdf
- Location B Existing ditch longitudinal section - 2016-039
-
- Southfield FAS - GIR.pdf
- Ground Investigation GIR- 2016-039
-
- 204628.106.pdf
- Proposed ramp and swale details - 2016-039
-
- BT 2.pdf
- Services BT2 - 2016-039
About the buyer
Address
Municipal Offices
Promenade
Cheltenham
GL50 9SA
England
Share this notice
Closing: 23 September 2016
All content is available under the
