Published date: 12 September 2019
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Agricultural, farming, fishing, forestry and related products - 03000000
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
Construction work - 45000000
Repair and maintenance services - 50000000
Architectural, construction, engineering and inspection services - 71000000
Agricultural, forestry, horticultural, aquacultural and apicultural services - 77000000
Location of contract
South West
Value of contract
£25,000 to £35,000
Procurement reference
Trewen Bridge Weir Award Notice
Published date
12 September 2019
Closing date
30 July 2019
Contract start date
28 August 2019
Contract end date
30 September 2020
Contract type
Works
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Through the Water for Growth Project the Westcountry Rivers Trust will seek to improve stocks of migratory fish such as salmon and seatrout in the rivers Camel and Fowey.
Funded by the European Union Structural Development Fund and in partnership with the Environment Agency, Natural England and South West Water, we will look to improve upstream and downstream fish passage, improve in river and bankside habitat, improve spawning habitats with the aim to increase numbers of juvenile salmon and seatrout.
The project is about improving Cornwall's 'natural capital' (the rivers and their associated plants and animals) and in return encourage and facilitate a responsible and sustainable exploitation of this natural capital in the form of angling.
We are seeking a suitably qualified and experienced contractor to undertake the proposed fish passage easement at Trewen Bridge Weir, located in Cornwall on the River Allen which is part of the River Camel catchment. The works include the provision of a new weir glacis, low cost baffles and eel tile eel pass. The structural design of the proposed new glacis by the appointed contractor is also required.
It is anticipated that the works can be undertaken within the 2019 in-river work window which closes at the end of September.
The consents required for the works are currently being sought. The undertaking of the works is subject to all consents being secured prior to September 2019.
WRT are under an obligation to ensure compliance with EU principles of transparency, equality and non-discrimination, as such WRT is conducting a formal open tender process in which all bidders will be treated equally, with no discrimination and through a transparent process.
More information
Previous notice about this procurement
W4G - Trewen Bridge Weir Fish Passage Construction including update 22 July 2019
- Opportunity
- Published 22 July 2019, last edited 22 July 2019
Attachments
-
- Trewen Project Information.pdf
- Bidding documents
- Project Information
-
- Trewen Invitation to Tender (ITT).pdf
- Bidding documents
- Invitation to Tender (ITT)
-
- 01 Trewen Bridge Weir - Site Location Plan.pdf
- Bidding documents
- Site Location Plan
-
- 02 Trewen Bridge Weir - Detailed Site Location and Block Plan.pdf
- Bidding documents
- Detailed Site Location and Block Plan
-
- 03 Existing Layout Plan.pdf
- Bidding documents
- Existing Layout Plan
-
- 04 Proposed Layout Plan rev. A.pdf
- Bidding documents
- Proposed Layout Plan Rev. A
-
- 05 Sections - Existing and Proposed rev. A.pdf
- Bidding documents
- Sections - Existing and Proposed Rev. A
-
- 06 Proposed Temporary Works Plan.pdf
- Bidding documents
- Proposed Temporary Works Plan
-
- Trewen Bridge DRA.pdf
- Bidding documents
- Designers Risk Assessment
-
- Trewen Construction Method Statement.pdf
- Bidding documents
- Construction Method Statement
-
- Trewen Bridge Photo Record.pdf
- Bidding documents
- Photo Record
-
- C23_20190701_DC_C_Trewen_NEC ECSC TEMPLATE_ITT.doc
- Bidding documents
- NEC3 Construction Contract
-
- WRT BioSecurity Procedure 2018.pdf
- Bidding documents
- WRT Biosecurity Procedure
-
- C23_20190722_DC_C_TrewenITT_tenderclarifications.pdf
- Bidding documents
- Tender Clarifications 22 July 2019
-
- 04 Proposed Layout Plan rev.B.pdf
- Bidding documents
- Proposed Layout Plan rev. B
-
- 05 Sections - Existing and Proposed rev.B.pdf
- Bidding documents
- Sections - Existing and Proposed rev. B
Links
-
- http://wrt.org.uk/about-us/contractor-opportunities/
- Tender notice
- Westcountry Rivers Trust website
Additional text
-
Please note that the delivery of the project is totally dependent on attaining all required statutory consents by September 2019.
Tender Clarifications issued 22 July 2019
Award information
Awarded date
29 August 2019
Contract start date
30 August 2019
Contract end date
30 September 2020
Total value of contract
£25,436
This contract was awarded to 1 supplier.
Castleford Engineering
Address
Castleford Engineering Ltd
Pool Farm
Liverton
Newton Abbot
Devon
TQ12 6HXReference
Companies House number: 09450998
Value of contract
£25,436
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Trewen Bridge Weir Fish Passage Improvements
Address
Kyl Cober Parc
Callington
PL178PH
England
Telephone
01579 372140
Website
Share this notice
Closing: 30 July 2019