Published date: 13 June 2023

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 11 July 2023, 2pm

Contract summary

Industry

  • Construction-site supervision services - 71521000

  • Construction consultancy services - 71530000

  • Consulting services for water-supply and waste consultancy - 71800000

Location of contract

GU24 0NF

Value of contract

£60,000 to £65,000

Procurement reference

Brooksby/SIL 1 H20/2023

Published date

13 June 2023

Closing date

11 July 2023

Closing time

2pm

Contract start date

1 September 2023

Contract end date

31 August 2024

Contract type

Service contract

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design of a safety system that detects flooding of the drainage system in the building. The system subsequently responds by shutting down the building water supply system. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail.

Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows:

• Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves)
• Bill of Materials (BoM) for all materials and accessories to be purchased
• Quotations for all required materials
• Functional logic diagrams (if required)
• I/O lists
• Functional Design Specifications (FDS)
• Loop diagrams
• Instrument wiring diagrams
• Electrical wiring diagrams
• Control panel layout and drawings
• Safety Integrity Level (SIL) Verification report
• SIL certifications for all relevant hardware (if available)
• Factory Acceptance Test (FAT) procedures
• Site Acceptance Test (SAT) procedures
• Safety Instrumented System (SIS) installation plan
• SIS validation plan
• Safety manuals
• Proof test procedure
• Spare parts list
• Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).