Contract summary
Industry
Electricity, heating, solar and nuclear energy - 09300000
Plant upgrade work - 45259900
Heating engineering services for buildings - 71314310
Engineering design services for mechanical and electrical installations for buildings - 71321000
Mechanical engineering services - 71333000
Mechanical and electrical engineering services - 71334000
Location of contract
GU24 0NF
Value of contract
£285,300 to £315,000
Procurement reference
BC24-002
Published date
2 December 2024
Closing date
13 January 2025
Closing time
12pm
Contract start date
3 February 2025
Contract end date
31 October 2025
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Pirbright Institute is inviting tenders for the CHP LTHW Heat recovery project - Principal Contractor & Installation Work Package.
The contract is for a single supplier to provide the Principal Contractor role and deliver Mechanical & Electrical Installation, commissioning of the CHP LTHW Heat Recovery project.
As part of this tender scope a RIBA3 Design for Tender M&E package has been provided to enable vendors to price this work package.
The contract is for a single supplier to be the Principal Contractor and to deliver Mechanical & Electrical installation works for the integration of a heat recovery system from the sites existing CHP to the Plowright Building at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF.
The scope of works will involve:
• Preparation for a construction ready design as outlined in Section 4.4. Appendix E - CHP LTHW Heat Recovery Principal Contractor Specification V1.1.
• Supply, manufacture, delivery and installation of Mechanical & Electrical works as outlined in the provided design pack within this ITT.
• Planning of works and required shutdowns to implement enabling works
• Working with nominated controls contractor to ensure implementation of control packages are planned accordingly into construction phase program
• Final commissioning on completion of system installation.
• On completion of commissioning, remove and dispose of any redundant plant & equipment
• Management of all subcontractors employed by the supplier to complete these works.
• Training and Operational Procedures
• On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning. A separate section should be provided to show details of the following:
o Brief Description of the works being carried out.
o Project Risk Assessment.
o Key structural principals.
o Hazardous materials used.
o Information on the future removal of installed plant.
o H&S information about equipment provided for cleaning or maintaining installed plant.
o The nature, location and markings of significant services.
o Information and as built drawings of buildings, plant and equipment.
o Step by step activities to carry out the works.
o Lesson Learnt, challenges met and how they were overcome.
A CDM Construction site will be set up as part of the overall project which will provide for the following:
• Site Supervision
• HERRAS fencing and appropriate signage around CDM area
• Site Office
• Welfare Office including changing areas
• Waste skips
• Scissor lift
• Fork-lift truck / telehandler
• CDM documentation / inductions / daily logs / management of RAMS
For this tender, the supplier is required to provide a cost for annual servicing of the newly installed heat recovery plant. The requirements for this service contract are:
• Spares List showing the itemised costs.
More information
Attachments
-
- 1. INVITATION TO TENDER - CHP LTHW Heat Recovery Principal Contractor V1.docx
- Bidding documents
- This document is superseded by Addendum 1. INVITATION TO TENDER - CHP LTHW Heat Recovery Principal Contractor V2.
-
- 2. Appendix A - Supplier Pre-Qualification Questionnaire.docx
- Bid submission documents
-
- 3. Appendix B - Scoring Matrix V1.pdf
- Evaluation criteria
-
- 4. Appendix C - Pricing Schedule V1.xlsx
- Bid submission documents
-
- 5. Appendix D - NEC4 ECC OpA Contract Data_V1.docx
- Contract draft
-
- 6.a. Appendix E - CHP LTHW Heat Recovery Main Contractor Specification_V1.pdf
- Technical specifications
- This document is superseded Addendum 6. Appendix E - CHP LTHW Heat Recovery Main Contractor Specification V2.
-
- 6.b. Appendices E1 - E10b.zip
- Technical specifications
-
- 7. Appendix F - Form of Offer.docx
- Bid submission documents
-
- 8. Appendix G - The Pirbright Institutes use of animals in research.pdf
- Bidding documents
-
- 9. Appendix H - RIBA3 Design for Tender.zip
- Technical specifications
-
This document is superseded by:
9. Appendix H1 Mechanical
9. Appendix H2 Electrical
9. Appendix H3 Specifications
-
- Addendum 1. INVITATION TO TENDER - CHP LTHW Heat Recovery Principal Contractor V2.docx
- Bidding documents
- This document replaces 1. INVITATION TO TENDER - CHP LTHW Heat Recovery Principal Contractor V1. The addendum is due to revision to the CDM Construction site requirements under 3 Contract Scope.
-
- Addendum 6. Appendix E - CHP LTHW Heat Recovery Main Contractor Specification V2.pdf
- Technical specifications
- This document replaces 6.a. Appendix E - CHP LTHW Heat Recovery Main Contractor Specification_V1. The addendum is due to updates around the CDM site set up.
-
- 9. Appendix H1 Mechanical.zip
- Technical specifications
- This document replaces 9. Appendix H - RIBA3 Design for Tender as there was an issue opening some of the documents as the destination path was too long.
-
- 9. Appendix H2 Electrical.zip
- Technical specifications
- This document replaces 9. Appendix H - RIBA3 Design for Tender as there was an issue opening some of the documents as the destination path was too long.
-
- 9. Appendix H3 Specifications.zip
- Technical specifications
- This document replaces 9. Appendix H - RIBA3 Design for Tender as there was an issue opening some of the documents as the destination path was too long.
-
- Addendum 1. INVITATION TO TENDER - CHP LTHW Heat Recovery Principal Contractor V3.docx
- Bidding documents
- This document replaces Addendum 1. INVITATION TO TENDER - CHP LTHW Heat Recovery Principal Contractor V2. The addendum is due to extending the date for receipt of Tender Submissions from 12:00 (noon) 07/01/2024 to 12:00 (noon) 13/01/2024 and other associated dates. Please review the doc to ensure compliance.
-
- Tender Clarifications Q&A - CHP LTHW Heat Recovery Principal Contractor.pdf
- Clarifications to bidders questions
About the buyer