Published date: 4 July 2024
Last edited date: 23 July 2024
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Engineering services - 71300000
Fire-prevention services - 75251110
Location of contract
IP17 1SP
Value of contract
£5,930,364
Procurement reference
BPA Capital Programme - Fire Consultant
Published date
4 July 2024
Closing date
2 August 2024
Closing time
12pm
Contract start date
22 August 2024
Contract end date
31 May 2026
Contract type
Service contract
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Fire Consultant design services for workstreams CH1 / CH2 / CH3 / BP1 / AC1 (which are 5nr workstreams out of an anticipated 15nr workstreams for the Capital Programme)
More information
Attachments
-
- BPA - Fire Consultant ITT 02.07.24.pdf
- Bidding documents
- Invitation To Tender (ITT) includes background to BPA and the Capital Project, Scope of Services, Design Responsibility Matrix and bidding instructions
-
- Fire.xlsx
- Bidding documents
- Excel pricing schedule to be returned as part of bidding submission
-
- BPA All Projects Master Programme Rev 6 Expanded.pdf
- Project plan
- Expanded programme to inform current timeline for RIBA stages
Links
-
- https://app.box.com/f/b19e42709a4348b2adab15508f20f736
- Bidding documents
- The link is to the tender submission folder. No tender submissions are to be issues to BPA directly
Additional text
-
The workstreams are subject to funding being secured along with planning permission and listed building consent being obtained. The works will be signed off to proceed at each RIBA works stage subject to these variables.
Addendum 1 -
Q1 Please issue alternative format for the ITT
A1 No alternative format of the ITT is available
Q2 Ref ITT question 7.3 we will not be subcontracting any work. Could you confirm that it will be ok to answer as N/A for that response.
A2 If no works are to be subcontracted we have no objection to this being answered as N/A
Addendum 2 - Project plan expanded programme included to inform timelines for RIBA stages
Addendum 3
Q1 Where the scope of services requests a 'fire strategy report' for the blocks, it is understood this refers to the Snape Maltings Concert Hall, the Britten Pears Building and the accommodation blocks (Snape Rooms and Elizabeth Court only). Does the client request fire strategy input to the areas which are changing in use; or is this a full holistic review of the building, including existing conditions.
A1 Yes the request relates to the Concert Hall, Britten Pears Building, Snape Rooms (AC1) and Elizabeth Court (AC3). It identifies the need to establish the current fire strategy for each location, identify if it needs addressing as a result of the proposed alteration works to each building and determining the fire strategy for the change of use (which applies only to Snape Rooms).
Q2 Where the scope of services requests a 'review of the sprinkler system'; does the client request a high-level review of the proposed system (i.e., category, coverage area to ensure it is suitable for the Fire Strategy); or a detailed review of all design drawings and specification of the system.
A2. A sprinkler system is already in place in the Concert Hall and the requirement is to assess how the proposed works affect it and the need to alter to comply with the fire strategy. This may include design drawings and specification for input in to a tender.
About the buyer
Contact name
Ken Baines
Address
Snape Maltings Concert Hall
Saxmundham
IP171SP
England
Telephone
07970161832
Website
Share this notice
Closing: 2 August 2024, 12pm