Published date: 12 March 2025
This notice was replaced on 12 March 2025
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Opportunity (published 12 March 2025, last edited 20 March 2025)
Closed future opportunity - This means that a potential contract has passed its approach to market date. A buyer can choose to consider any supplier interest or convert this notice into an opportunity ready for live procurement.
Contract summary
Industry
Refurbishment work - 45453100
Location of contract
IP17 1SP
Value of contract
£2,100,000
Procurement reference
BPA Capital Programme BP1
Published date
12 March 2025
Approach to market date
11 March 2025
Contract start date
11 August 2025
Contract end date
4 May 2026
Procedure type
Competitive procedure with negotiation (above threshold)
Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Britten Pears Building (BP1)
Full internal refurbishment including new mechanical and electrical services, new toilets and refurbished windows, excluding the Trask Café and Kitchen finishes. Construction of a new lift tower to enable enhanced access to upper floors, facilitated by partial wall and roof removal.
Removal of the existing and installation of a new repositioned sprinkler tank in the service yard between the Britten Pears Building and the Concert Hall.
General access improvements, including a new entrance ramp and passenger and equipment lift to all floors and the replacement and automation of the entrance doors.
Conversion of the first floor practice rooms to provide seven larger multifunction studios/break out spaces.
Creation of an accessible top floor multi-purpose activity space, created through internal reconfiguration of the Cranbrook Room.
Thermal upgrades to fabric to reduce energy consumption.
Transformation of the Peter Pears Recital room into flexible studio and refurbishment of its bleacher seating.
Removal of the old technical room to create accessible seating areas.
New lighting system, sound and video infrastructure including permanent lighting and AV control position. New wheelchair positions to the upper level and improved wheelchair access to the lower level.
Installation of a backstage Technical AV infrastructure throughout the building.
External soft and hard landscaping alterations including steps and ramps and car park resurfacing to enable the provision of 3 blue badge parking bays.
Works to be carried out in accordance with ecological requirements, including a Reasonable Avoidance Measures (RAMs) Method Statement and Construction Environmental Management Plan (CEMP).
Carpark and Landscaping (FLD2)
This scope is split into three parts, and will include surface upgrades with resin bound gravel and parking bay markings to allow the provision of Blue Badge spaces, with associated lighting improvements. Upgrades will be to the following areas:
North car parks, including the Craft Shop and pond-side car parks to North West of the Concert Hall
South car park, the Paddock car park to the South East of the Britten Pears Building
BPA is seeking a Principal Contractor to complete the above works. The procurement of the works will follow a two stage flexible competitive tender process consisting of the following:
- Stage 1: Selection Questionnaire (PQQ), issued on the Central Digital Platform
- Stage 2: Tender, issued to successful contractors following Stage 1.
More information
Spend profile
Financial year | Budget |
---|---|
2025/2026 | £2,100,000 |
Attachments
-
- BPA Capital programme BP1 & FLD2 PQQ.docx
- Bidding documents
- Pre Qualification Questionnaire including details of the project and scoring criteria relating to progression to second stage
-
- Britten Pears Arts_BP1_RIBA 3 Report.pdf
- Bidding documents
- RIBA Stage 3 design report for Britten Pears Building - workstream reference BP1
-
- Britten Pears Arts_FLD2_RIBA 3 Report.pdf
- Bidding documents
- RIBA Stage 3 design report for Britten Pears Building adjacent landscaping works - workstream reference FLD1
-
- CDP Tracker 06.03.25 (BP1 & FLD2).pdf
- Bidding documents
- Contractors Design Portion tracker for the Britten Pears Building (BP1) and adjacent landscaping (FLD2) workstreams
Links
-
- https://eur01.safelinks.protection.outlook.com/?url=https://app.box.com/f/a8ff6ed007f847d59f4227e4f382e77b&data=05|02|kbaines@brittenpearsarts.org|24a22493e86a45008c3e08dd60860658|70d50667bd5d457da284c0692661f5bc|0|0|638772850948966439|Unknown|TWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ==|0|||&sdata=YjmcOOXfLVaw3qvHF8RVIPXL/5ElUrn2ajMK35PilN4=&reserved=0
- Bid submission documents
- The link is to the PQQ submission folder. No submissions are to be issued to BPA directly but are to be uploaded using the BOX access provided