Published date: 9 June 2021

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 22 January 2021, 12pm

Contract summary

Industry

  • Construction work - 45000000

Location of contract

North West

Value of contract

£0

Procurement reference

National Museums Liverpool - Roof repair work at Juniper St Building

Published date

9 June 2021

Closing date

22 January 2021

Closing time

12pm

Contract start date

22 February 2021

Contract end date

26 March 2021

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

** Please do not attend site without booking an appointment **

Bidders are asked to submit a formal tender for the "Juniper Street Building 1 Roof Repair Project"
NML is looking to appoint a Principle Contractor to complete a package of works to make the building watertight and extend the building life span. The work has been separated into Required work and Desirable work. The reason for this being the Required work is immediate to stop the severe water ingress when the Desirable will extend the building life span. We may not be able to go ahead with Desirable depending on budget restraints.

Required
• For Roof A & Roof B required work is clean and remove all debris of the gutters before the roof takes place.
• Fully remove and re-line gutters with a rolled-on membrane which is then fixed to the abutment under the flashing. This is done with combination of mechanical fixings and hot air welds. The system would include the insertion of liners into the rainwater outlets are heat welded into place.
• For Roof B a steel flashing should be used to cover the edges of the new gutter lining.
• Replace all the spouts on Roof A & B.
• As part of this work to Roof B application of the membrane you will be required to lift the coping stones in order to allow the new gutter lining.
• Reduce the parapet ere is parapet between two sections of the single storey roof.
• Complete design and install for a compliant safe access system for Roof B

Desirable
• On Roof A the hip ridges, water seeps through due to the insulation being decayed or lost in some areas. The flashings need to be lifted and the fillers need to be replaced and the flashings re-instated.
• Cut edge corrosion repair should be undertaken.


More information

Previous notice about this procurement

National Museums Liverpool - Roof repair work at Juniper St Building

  • Opportunity
  • Published 4 January 2021, last edited 20 January 2021

Attachments


Award information

Awarded date

23 March 2021

Contract start date

12 April 2021

Contract end date

21 May 2021

Total value of contract

£130,570.36

This contract was awarded to 1 supplier.

Bodacc Ltd

Address

Unit 8
Griffin Enterprise Park
Gwynedd
LL48 6LE

Reference

No reference - other

Supplier is SME?

Yes

Supplier is VCSE?

No


About the buyer

Contact name

Ian Lindsay

Address

127 Dale Street
LIVERPOOL
L22JH
England

Telephone

0

Email

Ian.lindsay@liverpoolmuseums.org.uk