Published date: 9 June 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Location of contract
North West
Value of contract
£0
Procurement reference
National Museums Liverpool - Roof repair work at Juniper St Building
Published date
9 June 2021
Closing date
22 January 2021
Closing time
12pm
Contract start date
22 February 2021
Contract end date
26 March 2021
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
** Please do not attend site without booking an appointment **
Bidders are asked to submit a formal tender for the "Juniper Street Building 1 Roof Repair Project"
NML is looking to appoint a Principle Contractor to complete a package of works to make the building watertight and extend the building life span. The work has been separated into Required work and Desirable work. The reason for this being the Required work is immediate to stop the severe water ingress when the Desirable will extend the building life span. We may not be able to go ahead with Desirable depending on budget restraints.
Required
• For Roof A & Roof B required work is clean and remove all debris of the gutters before the roof takes place.
• Fully remove and re-line gutters with a rolled-on membrane which is then fixed to the abutment under the flashing. This is done with combination of mechanical fixings and hot air welds. The system would include the insertion of liners into the rainwater outlets are heat welded into place.
• For Roof B a steel flashing should be used to cover the edges of the new gutter lining.
• Replace all the spouts on Roof A & B.
• As part of this work to Roof B application of the membrane you will be required to lift the coping stones in order to allow the new gutter lining.
• Reduce the parapet ere is parapet between two sections of the single storey roof.
• Complete design and install for a compliant safe access system for Roof B
Desirable
• On Roof A the hip ridges, water seeps through due to the insulation being decayed or lost in some areas. The flashings need to be lifted and the fillers need to be replaced and the flashings re-instated.
• Cut edge corrosion repair should be undertaken.
More information
Previous notice about this procurement
National Museums Liverpool - Roof repair work at Juniper St Building
- Opportunity
- Published 4 January 2021, last edited 20 January 2021
Attachments
-
- .Juniper Street B1 Roof Repair Tender.docx
- Tender notice
- Tender Specification
-
- Appendix A - T2 Form of Tender.doc
- Tender notice
- Appendix A - T2 Form of Tender
-
- Appendix B - NML Supplemental Conditions.doc
- Tender notice
- Appendix B - NML Supplemental Conditions
-
- Appendix C - Safety Guidelines for Contractors 2015.doc
- Tender notice
- Appendix C - Safety Guidelines for Contractors 2015
-
- Appendix D - H & S Questionnaire.doc
- Tender notice
- Appendix D - H & S Questionnaire
-
- Appendix E - NML Procurement Protocol.docx
- Tender notice
- Appendix E - NML Procurement Protocol
-
- Appendix F - Pre-Construction Information - Juniper Street Roof Repairs.pdf
- Tender notice
- Appendix F - Pre-Construction Information - Juniper Street Roof Repairs
-
- Appendix G - Tender Summary Sheet.docx
- Tender notice
- Appendix G - Tender Summary Sheet
-
- Appendix H - Preliminaries JCT ICD 2016.pdf
- Tender notice
- Appendix H - Preliminaries JCT ICD 2016
-
- Appendix I - Roof Condition Survey.pdf
- Tender notice
- Appendix I - Roof Condition Survey
-
- Appendix J -SC CW to E.PDF
- Tender notice
- Appendix J -SC CW to E
-
- Appendix K - Contractor Document Information .docx
- Tender notice
- Appendix K - Contractor Document Information
-
- Appendix L - R&D Asbestos Survey - Scheduled 8012021.pdf
- Tender notice
- Appendix L - R&D Asbestos Survey - Scheduled 8012021
-
- Appendix M - Safe Access Testing Certificates.pdf
- Tender notice
- Appendix M - Safe Access Testing Certificates
-
- NML Juniper St Roof Repairs Tender Questions.docx
- Tender notice
- Q&As
-
- Roof A #1.jpg
- Tender notice
- Roof A1
-
- Roof A #2.jpg
- Tender notice
- Roof A2
-
- Roof A #3.jpeg
- Tender notice
- Roof A3
-
- Roof B #1.jpg
- Tender notice
- Roof B1
-
- Roof B #2.jpg
- Tender notice
- Roof B2
-
- Roof B #3.jpg
- Tender notice
- Roof B3
-
- Roof B #4.jpeg
- Tender notice
- Roof B4
-
- Roof B #5.jpeg
- Tender notice
- Roof B5
-
- Roof B #6.jpeg
- Tender notice
- Roof B6
-
- Juniper Street 1 R&D Survey Report 21.01.2021.pdf
- Tender notice
- Juniper Street 1 R&D Survey Report 21.01.2021
-
- Pre-Construction Information - Juniper Street Roof Repairs v2.pdf
- Tender notice
- Pre-Construction Information - Juniper Street Roof Repairs v2
Award information
Awarded date
23 March 2021
Contract start date
12 April 2021
Contract end date
21 May 2021
Total value of contract
£130,570.36
This contract was awarded to 1 supplier.
Bodacc Ltd
Address
Unit 8
Griffin Enterprise Park
Gwynedd
LL48 6LEReference
No reference - other
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Ian Lindsay
Address
127 Dale Street
LIVERPOOL
L22JH
England
Telephone
0
Share this notice
Closing: 22 January 2021, 12pm