Published date: 1 February 2017
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Installation services (except software) - 51000000
Location of contract
SE1 2JH
Value of contract
£180,000 to £200,000
Procurement reference
IWM/CWP/1582
Published date
1 February 2017
Closing date
28 February 2017
Contract start date
1 June 2017
Contract end date
28 September 2017
Contract type
Not applicable
Procedure type
Not applicable
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Foul waste currently is pumped from the ship via two macerator pumps - one located forward, the other aft. The sewage pipes are flexible rubber, and run down the side of the ship, across the river bed an up through the river wall to connect into a drain in front of the 'Pavilion' building which accommodates the visitor entrance.
The Contract comprises:
1. Replacement of the two macerator sewage pumps on the HMS Belfast.
2. Supply and install a new permanent connection to land of insulated, trace heated, stainless steel foul rising main from the pumps, along the ship and across the 'Brow' walkway
3. Connection of same into the foul drain on shore to a manhole adjacent to the South side of the entrance pavilion in the paved area.
4. Existing flexible drainage lines are to be flushed and removed. These are weighted down using chains and concrete blocks
More information
Attachments
-
- ITT Cov Let.doc
- Tender notice
-
- HMS Belfast Draft spec USK 002 (002) rev 1.docx
- Tender notice
-
- Copy of New Supplier Form.xls
- Tender notice
-
- J15517 - 01 - Rev 00.pdf
- Tender notice
-
- Ridge PCI document.pdf
- Tender notice
About the buyer
Contact name
Jamie Coyle
Address
IWM London, Lambeth Road
London
SE1 6HZ
England
Telephone
0207 091 3193
Website
Share this notice
Closing: 28 February 2017
All content is available under the