Published date: 14 October 2024

Last edited date: 21 November 2024

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 29 November 2024, 12pm

Contract summary

Industry

  • Waste incinerators - 42320000

  • Construction work - 45000000

  • Consultative engineering and construction services - 71310000

    • Engineering design services - 71320000

    • Air pollution monitoring or measurement services - 90731400

Location of contract

GU24 0NF

Value of contract

£125,000 to £130,000

Procurement reference

BC22-004 WP3

Published date

14 October 2024

Closing date

29 November 2024

Closing time

12pm

Contract start date

13 January 2025

Contract end date

28 November 2025

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The contract is for a single supplier to provide Design and Build of Work Package 3 - Design and Build of a Replacement Continuous Emissions Monitoring System (CEMS) and Secondary chamber Oxygen monitoring with new system(s), compliant with all current standards, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF.

The scope of this contract is to replace the CEMS and Oxygen Analyser to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years.

The scope of works will involve:
• Detailed design work for the new CEMS and Oxygen Analyser, ensuring it complies with the URS and all applicable standards
• Supply, manufacture, delivery and installation of the new CEMS and Oxygen Analyser
• Offline commissioning of the new CEMS and Oxygen Analyser
o It is a recommended that as much pre-commissioning works takes place prior to the shutdown
• During the scheduled shutdown, the field sensors will be installed.
• Final commissioning with the incinerator in operation.
• On completion of commissioning, remove and dispose of existing CEMS from Incinerator Plantroom.
• Management of all subcontractors employed by the supplier to complete these works.
• Training and Operational Procedures
• On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning. A separate section should be provided to show details of the following:
o Brief Description of the works being carried out.
o Project Risk Assessment.
o Key structural principals.
o Hazardous materials used.
o Information on the future removal of installed plant.
o H&S information about equipment provided for cleaning or maintaining installed plant.
o The nature, location and markings of significant services.
o Information and as built drawings of buildings, plant and equipment.
o Step by step activities to carry out the works.
o Lesson Learnt, challenges met and how they were overcome.

A CDM Construction site will be set up as part of the overall project which will provide for the following:
• Site Supervision
• HERRAS fencing and appropriate signage around CDM area
• Site Office
• Welfare Office including changing areas
• Waste skips
• Scissor lift
• Fork-lift truck / telehandler
• CDM documentation / inductions / daily logs / management of RAMS

For this tender, the supplier is required to provide a cost for annual servicing of the new CEMS and Oxygen Analyser. The requirements for this service contract are:
• 12-month routine service, preventative maintenance & calibration services
• Critical Spares List showing the itemised costs
• Work Rates for additional works required outside the scope of the routine service.


More information

Attachments

  • 1. ITT - WP3 CEMS Replacement Project V2.docx
  • Bidding documents
  • This revised doc replaces 1. ITT - WP3 CEMS Replacement Project. The difference being we have added more details on what we are looking for in regards to the case studies under 3.3 Tender Submission Requirements.
  • 1. ITT - WP3 CEMS Replacement Project V3 21 11 2024.docx
  • Bidding documents
  • The document replaces 1. ITT - WP3 CEMS Replacement Project V2 due to an extension to the tender closing deadline i.e. to 12:00 (Noon) 29/11/2024. The only differences to the previous version are the amendment of the tender closing deadline as above and the start of the evaluation period which is now 02/12/2024.

Additional text

Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to Procurement.Department@pirbright.ac.uk asap. Then and only then will access to the full ITT package (6. Appendix E1 - Site Documents & 6. Appendix E2 - Existing CEMS Drawings) be granted to the requester.