Contract summary
Industry
Museum services - 92521000
Location of contract
South West
Value of contract
£260,000
Procurement reference
Shire Hall Exhibition Provision
Published date
20 February 2017
Closing date
13 September 2016
Contract start date
3 January 2017
Contract end date
1 January 2018
Contract type
Works
Procedure type
Not applicable
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Provision of permanent interpretation about the history of justice and workers' rights in Dorset in line with an Interpretation Plan Grade 1.
The building is a Grade 1 listed courtroom with cells beneath. Preworks which will complete before the exhibition is installed are complete refurbishment, rewiring and alteration to the building. Exhibition provider will provide a turnkey package, including: project manage and deliver all aspects of the interpretation including content, fit out, branding, website and software applications, AV content, 3d content, graphics and publications.
This contract does not include the production of a multi-media guide, which will be tendered separately. Off-site work to be coordinated with the Main Works contractor during their work on site. Handover of clean, completed site to Exhibition Provider is due to be October 2017.
Following prequalification, tender evaluation will be on the basis of a fixed cost for all the works so all tenders will be evaluated only on the quality of their submissions. Details of this will be provided at tender stage.
To participate in this procurement, please complete the attached Pre-Qualification Questionnaire (PQQ) and read the associated documents. PQQs must be returned by email to Sarah Cairns: SCairns@dorset.gov.uk no later than 12:00pm on September 19th 2016.
More information
Attachments
-
- 358_201_revR.pdf
- 358:201 Upper Ground and Lower First Proposed floor plan
-
- 358_200_revT.pdf
- Basement and Lower Ground Proposed floor plan
-
- T6 PQQ Instructions To Organisations and Guide.doc
- PQQ Instructions and Guide
-
- SHD Interpretation Strategy Final.docx
- Interpretation Plan
-
- PHA_407_Meet the accused room_floor and railing.pdf
- Meet the Accused room floor and railings
-
- 358_202_revQ.pdf
- 358:202 Upper First and Second Proposed floor plans
-
- T7 PQQ Core Questions_SHIREHALL_ExhibitionProvision.docx
- Pre-Qualification Questionaire
Additional text
-
Clarification Responses:
• This project is partly funded by HLF and Permission To Start was gained in July 2015. The rest of the cost of the project is provided by West Dorset District Council and other funders.
• Full design has been completed for alterations to the building fabric and outline plans showing proposed works will be included in the tender document. These works are due to start in late autumn 2016.
• An interpretation plan incorporating a description of each room of the permanent exhibition will be included in the tender documents but the exhibition provider will be expected to provide a final design of the exhibition.