Published date: 19 October 2023
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Transport services (excl. Waste transport) - 60000000
Location of contract
LU4 9UB
Value of contract
£670,000
Procurement reference
M1 J9-13 - Haulage Package
Published date
19 October 2023
Closing date
26 October 2023
Closing time
5pm
Contract start date
27 October 2023
Contract end date
31 July 2025
Contract type
Works
Procedure type
Competitive procedure with negotiation (above threshold)
Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
On behalf of SMP Alliance working with National Highways we (Balfour Beatty Engineering Ltd) require Haulage via Subcontract to remove muckaway from our site on project M1 J9-13.
Overall Scope of Works:
The existing central reserve Vehicle Restraint System (VRS) is being upgraded along the section of motorway from Junction 10 to Junction 13 as part of the Dynamic Hard Shoulder (DHS) safety enhancement scheme.
The barrier upgrade is to be a Rigid Concrete Barrier system that will be slip-formed in-situ or pre-cast. The in-situ barrier will be Davidsons Concrete Barrier (DCB). The Pre-cast barrier will be Deltabloc Barriers. At bifurcation locations either precast Delta bloc DB 80E barriers or precast DB 80AS-E will be used. As part of the central reservation upgrades works - the drainage system where required will also be upgraded - mainly between J11a and J12.
In addition to the central reserve barrier upgrade there are 11no places of relative safety (PRS) to constructed, 5no on NB carriageway and 6no on SB carriageway. The PRS will compromise of localised widening by either re-grading the earthworks or by retentions solutions such as sheet pilling or precast concrete wall.
Please read the attached information and respond accordingly with answers to the questions set.
Please ensure that you hold Construction Line Gold at full accredtiation.
More information
Attachments
-
- MSC-TF-0001c - M1J1013 - Haulage RFQ Logistics Questions.docx
- Evaluation report
- Please complete the questions and submit via email
-
- HSF-SP-0046FF Fleet Specification - Tipper Grab Lorry.pdf
- Illustrations
- Fleet Specification - Tipper Grab Lorry
-
- RtB_1_Plant_and_Equipment_Apr_19.pdf
- Illustrations
- Plant & Equipment Information