Published date: 20 June 2019

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 16 June 2019

Contract summary

Industry

  • Research and development services and related consultancy services - 73000000

Location of contract

London

Value of contract

£17,000

Procurement reference

tender_141474/777899

Published date

20 June 2019

Closing date

16 June 2019

Contract start date

20 June 2019

Contract end date

31 March 2020

Contract type

Service contract

Procedure type

Call-off from a framework agreement

A mini-competition or direct purchase from a pre-established framework agreement.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Operations Directorate (OD) is seeking continued technical assistance and support in completing the steady state management of M60 Barton High Level Bridge (BHLB).
BHLB has recently been assessed for 40t loading and its ability to be jacked under live load for the Category 3 spans. A number of steady state issues in its current condition have been identified during BHLB ongoing 40t assessment work that need to be rectified in order to safeguard the bridge's future and operation of the M60 in a planned way.
The bridge is being managed under BD79, Management of Substandard Structures, procedures agreed with Safety Engineering and Standards Division on the understanding that concerns will be addressed through planned bridge bearing adjustment works. The issues of most concern were to have been addressed through the final year of the ASC 10 commission, which completed on 29th March 2019, but some work transferred into The AD 10 contract.
Assessment work going forward in April 2019 will inform the newly appointed Asset Delivery Contract who will manage the future remedial and repair works to Barton Bridge and agree any longer-term monitoring strategy that may be preferred to expensive strengthening works. It will also ensure that the main canal spans are in a state of readiness to be jacked at short notice.
This work will continue to address the assessment of the largest, Category 3 spans over the Manchester Ship Canal. AD 10 will use the outputs produced by Atkins, in conjunction with SES, to produce a design brief to instruct the Area 10 Design Services Contractor, Amey. Amey will produce a design to allow bearings supporting the canal span decks to be jacked and adjusted as required. The intention is to have this design completed before the end of the calendar year and before colder temperatures which may affect the expansion/contraction of the bridge.
The duration of this work is expected to be from 20th May 2019 to 31st July 2020 and is being delivered in accordance with Specialist Professional and Technical Services Framework (SPATs Lot 1) requirements and this brief.


More information

Attachments


Award information

Awarded date

20 June 2019

Contract start date

20 June 2019

Contract end date

31 March 2020

Total value of contract

£170,000

This contract was awarded to 1 supplier.

Atkins

Address

London

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Address

2 The Square
Bristol
BS1 6HA
England

Email

Spats_Framework_Lot1@highwaysengland.co.uk