Published date: 15 November 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Architectural, construction, engineering and inspection services - 71000000
Location of contract
South West
Value of contract
£1,000,000
Procurement reference
SWINDON001-DN558043-90006579
Published date
15 November 2021
Closing date
20 August 2021
Closing time
12pm
Contract start date
27 September 2021
Contract end date
17 December 2021
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the provision of resurfacing/structural patching of sections of roads in Swindon which have been identified as in need of essential highway maintenance as detailed in the specification and drawings (including the provision of all traffic management to complete the works).
Two packages of works are proposed to be delivered within one contract package. The patching/resurfacing works (and associated pre-works) for the combined package will include (where necessary):
• Carriageway patching/resurfacing
• Replacement of existing kerbing
• Adjustment of existing ironwork
• Replacement of road markings
• Replacement of High Friction Surfacing
• Replacement of Traffic Loops
• Provision of suitable traffic management proposals and on site (including necessary associated advance signage and diversions) to accommodate the work within constraints outlined within the tender documentation.
Full details relating to the Works are provided in the tender documents.
Contract Period
The initial contract term will be for 12 weeks as stated in the ITT documents.
The relevant tender documents are included within this project webpage as attachments.
To participate, Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the tender documents. In the event of difficulties registering as a supplier, please refer to the System Administrator Proactis support team ProContractSuppliers@proactis.com
Tender clarifications to be submitted in writing via Messaging in ProContract by Friday 13th August 2021, 1200 hrs noon UK Local time.
The Council's responses to these clarification questions will be issued on the ProContract tender portal. Therefore it is the Contractor's responsibility to check the site regularly for updates to clarifications.
Tender Responses are required to be submitted no later than 20th August 2021, 1200 hrs noon UK Local time via ProContract tender portal - https://www.supplyingthesouthwest.org.uk/
In the event of difficulties downloading tender documents, please refer to the named contacts Josephine Prunty / Elizabeth Obiora at hppd@swindon.gov.uk.
Please note that this project has been advertised on Contracts Finder, however, Supplying the South West Portal (www.supplyingthesouthwest.org.uk) is the only portal that includes all the relevant documents required to respond to this opportunity, bearing Project Id: DN558043
We would encourage you to click on the 'Register interest' button to help the Council monitor the level of interest in this opportunity and ensure you are notified of any further document uploads and clarifications.
No Tender submissions will be considered without completing the tender documents in full including attachments and returning them in alignment with the instructions within the tender documents.
More information
Previous notice about this procurement
Swindon Carriageway Resurfacing / Structural Patching
- Opportunity
- Published 21 July 2021
Links
-
- https://procontract.due-north.com/Advert?advertId=f51604d1-1dea-eb11-810d-005056b64545&p=696a9836-1895-e511-8105-000c29c9ba21
- To register your interest in this opportunity and obtain any additional information and documentation please login or register (for free) at:
Award information
Awarded date
26 October 2021
Contract start date
27 October 2021
Contract end date
19 January 2022
Total value of contract
£1,086,737.17
This contract was awarded to 1 supplier.
Connor Construction (South West) Ltd
Address
BA11 5DH
Reference
None
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Elizabeth Obiora
Address
Swindon Borough Council, Wat Tyler West, 5th Floor
Wat Tyler House, Beckhampton Street
Swindon
SN1 2JG
England
Telephone
+44 7966778583
Website
Share this notice
Closing: 20 August 2021, 12pm