Published date: 13 December 2018

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 16 November 2018

Contract summary

Industry

  • Construction work - 45000000

Location of contract

WR5 2PW

Value of contract

£0

Procurement reference

NJKPC/JG/Parish Hall Car Park

Published date

13 December 2018

Closing date

16 November 2018

Contract start date

26 November 2018

Contract end date

26 February 2019

Contract type

Not specified

Procedure type

Other: Please apply directly to the buyer using the contact details provided

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Norton Parish Hall Car Park Re-surfacing Proposal Specification

Site address: Norton Parish Hall, Wadborough Road, Littleworth, Worcs WR5 2QB

Work required: -

Car Park Area 1 (see attached plan):
• Remove the top layer of existing stone
• Install edging as plan with 150 mm high x 50mm thick bull-nosed kerbs, fixed and haunched in concrete (approx. 17.5 m long)
• Level with top soil and then grass seed the area beyond the edging
• Cover whole area with 50mm deep Forest of Dean 20mm gravel (reddish in colour)

Car Park Area 2 (see attached plan):
• Scrape out and consolidate for new road to a width of 6 metres x 125mm deep as shown on the plan. Shuttering with steel road forms. Pour in road-form quality concrete, vibrate and level.
• Provide expansion joints with dowel bars every 10 metres to help prevent cracking.
• Install edging in area 2, alongside the ditch, as plan with 150mm high x 50mm thick bull-nosed kerbs, fixed and haunched in concrete (approx. 65 m long) Level ditch area with top soil up to the new kerbs and seed.
• Lift and reset manhole covers to required levels
• Create small area of grey pressed concrete slabs 1800mm x 1800mm at bottom of ramp to pre-school to assist wheelchair access.
• Create small area of grey pressed slabs 1200mm x 3600mm in front of pre-school container to ease access
• Scrape to correct levels and cover all areas around the road etc as per plan with 20mm Forest of Dean gravel
• Retain the 3 existing ramps to the Hall building

Bin Store Area:
• Remove existing concrete base adjacent to the LPG tank, container posts, tree & surround and old tree stump
• Fix 900mm wide gate on existing path
• Create ramp from side door up to new bin storage area.
• Consolidate in stone hardcore where required and create new slabbed bin storage area with
600mm x 600mm grey pressed concrete slab. The slabbed area to be around LPG tank, level with Hall building and extending as far as the telegraph pole.
• Provide and install a fence of 125mm wide feather edged boards on 100 mm x 100mm timber supports (set in concrete), 150mm timber gravel boards and timber cross rails (x3) around the bin storage area.
• Fix pair of gates x 900mm each to provide access to front, gates to have galvanised furniture.

All waste to be cleared away in a proper manner, with the site left in a clean and tidy condition ready for use; and for all relevant Health & Safety legislation and guidance to be followed.

Please apply directly to the buyer using the contract details provided.


More information

Previous notice about this procurement

Car Park Re-surfacing Works

  • Opportunity
  • Published 19 October 2018

Attachments


Award information

Awarded date

29 November 2018

Contract start date

5 December 2018

Contract end date

25 January 2019

Total value of contract

£35,100

This contract was awarded to 1 supplier.

Albion Paving & Landscapes

Address

3 Clerkenleap Cottages
Bath Road
Broomhall
Worcester
WR5 3HR

Reference

None

Supplier is SME?

Yes

Supplier is VCSE?

No


About the buyer

Contact name

Jane Greenway

Address

18 Corunna Close
Norton
Worcester
WR5 2PW
England

Email

NJKparishclerk@aol.com