Published date: 3 November 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Electrical installation work - 45310000
Location of contract
PO1 3NH
Value of contract
£500,000 to £750,000
Procurement reference
227227
Published date
3 November 2022
Closing date
5 October 2022
Closing time
12pm
Contract start date
17 October 2022
Contract end date
31 March 2023
Contract type
Works
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
In 2017 the HMS Warrior Preservation Trust merged with the National Museum of the Royal Navy (NMRN), following the merger the NMRN conducted surveys of Warrior's electrical systems and identified that it requires extensive rewiring work. Previously in 2018 a tender was advertised but was not awarded following feedback from the submitted bids.
The ship and its systems host a staff presence 24/7 across the whole year, with members of the public visiting during opening hours of Portsmouth Historic Dockyard. The ship hosts events on board throughout the year, with catering for events being supplied by the fully equipped professional kitchen on board the ship. The ship maintains numerous systems such as; a macerator, speaker, fire detection, lighting and ventilation systems alongside the public-facing role. This tender is intended to help support the current and future power requirements of the NMRN onboard HMS Warrior.
The NMRN is seeking to rewire HMS Warrior to bring all electrical systems on board up to standard, this is across the ship and partially to the jetty alongside Warrior. The scope of work that suppliers will be required to replace and update includes;
- Removal and replacement of the existing electrical circuits onboard including; LV/Small Power Systems
- Removal of existing Fire Alarm and commissioning new Fire Alarm System (to L5 standard and L1 performance) across the ship.
- Removal and Installation of a new ship-wide PA System
- Removal and Updating of CCTV System
- Replacement of HVAC Ventilation System Wiring and Controls
- Provisions to replace and update the Mast Downlights and fittings for Seasonal Lighting (Foremast Christmas Tree lights).
- Requirement to refurbish approx. 150-period accurate replica light fittings; including updating to LED lighting and rewiring to reinstall and reuse.
These requirements may change in scope so this is currently indicative of at the time of writing. Full details can be found in the documentation attached to this tender.
The NMRN is using a JCT Design & Build Contract for this tender, please see the attached Annex C appendixes for further details.
The NMRN encourage all interested suppliers to attend a site visit to see HMS Warrior and throughout the ship in order to further understand the requirements of the NMRN Tender.
Site Visits may be booked via tenders@nmrn.org.uk and should give at least two working days to make arrangements.
The dates to book a site visit are;
Wednesday 21st September
Thursday 22nd September
Friday 23rd September (Morning Only)
All clarification questions should be sent to tenders@nmrn.org.uk, with responses released throughout the clarification period.
More information
Previous notice about this procurement
HMS Warrior Electrical Rewiring ITT
- Opportunity
- Published 26 August 2022, last edited 28 September 2022
Attachments
-
- NMRN ITT Open- HMSW Rewiring Annex D-E-F.pdf
- Tender notice
-
ITT Sections D-E-F
These are for completion and returning as part of the submission.
-
- NMRN Guidance and FAQs for Suppliers- HMSW Rewiring.pdf
- Tender notice
- Frequently Asked Questions regarding the NMRN's ITT.
-
- Appendix 1a- Design_and_Build_Contract_2016_Edition.pdf
- Contract draft
- This is a draft of the JCT Contract, it does not represent the final version.
-
- Appendix 1b- DB-2016-Rights-Particulars.pdf
- Contract draft
-
JCT Contract Draft- Rights Particulars
This is a draft and does not represent the final version.
-
- Appendix 1c DB-2016-FluctuationsOptionsBC.pdf
- Contract draft
- JCT Contract- Fluctuations Options for B & C.
-
- Appendix 2a 61413_Volume 1 General_Electrical Rewire Specification_August 2022.pdf
- Technical specifications
- Technical Specifications for the HMS Warrior Rewiring Work. Provided to the NMRN by consultants Chapman BDSP.
-
- Appendix 2b 61413_Volume 2B_Electrical Specification_August 2022.pdf
- Technical specifications
- Technical Specification for HMS Warrior Rewiring Works. This specification also includes line drawings of HMS Warrior and photographs of the period replica lighting.
-
- Appendix A5 - HMSW Pricing Schedule Tender FINAL.xlsx
- Bidding documents
- Pricing Schedule for works. Please complete it in full and return it as part of your submission.
-
- NMRN ITT Open- HMSW Rewiring Annex A-B-C v2.pdf
- Tender notice
-
HMS Warrior Electrical ITT- Version 2
Updated Site Visit Dates & Change to Submission Deadline.
-
- 61413_HMSW Electrical Rewiring- Clarifications Issue 1 - FINAL.pdf
- Clarifications to bidders questions
- Clarification Questions and Responses, including addendum relating to the refurbishment of replica historical lighting fixtures on board HMS Warrior.
Award information
Awarded date
14 October 2022
Contract start date
25 October 2022
Contract end date
31 March 2023
Total value of contract
£730,000
This contract was awarded to 1 supplier.
SEAKING ELECTRICAL LIMITED
Address
70 Old Bidston Road
BIRKENHEAD
Merseyside
CH41 8BL
GBReference
Companies House number: 04204287
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Dave Hartley
Address
National Museum of the Royal Navy (NMRN)
Main Road, HM Naval Base
PORTSMOUTH
PO1 3NH
England
Telephone
02392891370 ext 2042
Website
Share this notice
Closing: 5 October 2022, 12pm