Published date: 3 September 2021

Last edited date: 10 September 2021

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 22 September 2021, 5pm

Contract summary

Industry

  • Offshore services - 76520000

Location of contract

South West

Value of contract

£400,000

Procurement reference

CSP/2021/TEN02

Published date

3 September 2021

Closing date

22 September 2021

Closing time

5pm

Contract start date

1 October 2021

Contract end date

30 June 2022

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Celtic Sea Power is the trading name for Wave Hub Development Services Ltd, a Cornwall Council company.
Celtic Sea Power ("The Vendor") is seeking to remove 6 concrete and steel anchor blocks from the Twin Hub Ltd operated Floating Offshore Wind development site at Hayle in Cornwall, together with all other mooring spread components, as part of the preparation for the future development, construction and operation of a floating offshore wind (FLOW) array.
The Vendor is seeking solutions which;
• Ensure the blocks are removed before 30th June 2022
• Maximise opportunities to remove the blocks before the end of 2021
• Use the expertise and experience of the successful contractor to maximise value through vessel and operational window choice.
The anchor blocks were installed in 2014 as foundations for the SeaTricity wave energy device and consist of 6 clump weights, 4 Outer Mooring square clumps at 23 tonnes (dry) / 15 tonnes (wet) and 2 Centre Mooring circular clumps of combined to make a main clump of 126 tonnes (dry) / 80 tonnes (wet).
The vendor is seeking a suitable contractor to:
• Develop a methodology for the complete removal of the mooring clumps and residual mooring equipment from the Celtic Sea Power Site by end of June 2022;
• Undertake all HSEQ and Project planning in line with industry standards,
• Supply suitable vessels, plant, craneage, marine spread, ROV's inclusive of fuel, crew, lubes, stores, dues and other disbursements as required to execute the project plan,
• Transport blocks from site, land ashore and dispose of in line with all environmental and waste management legislation,
• Conduct post-removal ROV survey demonstrating that site is clear,
• Provide project plans, HSEQ documentation, daily progress reports, and final report.
The mooring spread is some 300m or so from the installed electrical infrastructure at the site - which comprises an export cable, hub and 4 x cable tails. A mission critical requirement for the successful contractor will be the minimisation of any potential damage to this infrastructure.

To apply, please download the attached tender documentation and follow instructions therein.


More information

Attachments


About the buyer

Contact name

Matt Hodson

Address

Chi Gallos Hayle Marine Renewables Business
Hayle
TR274DD
England

Telephone

+44(0)1736800290

Email

tenders@celticseapower.co.uk