Published date: 3 September 2021
Last edited date: 10 September 2021
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Offshore services - 76520000
Location of contract
South West
Value of contract
£400,000
Procurement reference
CSP/2021/TEN02
Published date
3 September 2021
Closing date
22 September 2021
Closing time
5pm
Contract start date
1 October 2021
Contract end date
30 June 2022
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Celtic Sea Power is the trading name for Wave Hub Development Services Ltd, a Cornwall Council company.
Celtic Sea Power ("The Vendor") is seeking to remove 6 concrete and steel anchor blocks from the Twin Hub Ltd operated Floating Offshore Wind development site at Hayle in Cornwall, together with all other mooring spread components, as part of the preparation for the future development, construction and operation of a floating offshore wind (FLOW) array.
The Vendor is seeking solutions which;
• Ensure the blocks are removed before 30th June 2022
• Maximise opportunities to remove the blocks before the end of 2021
• Use the expertise and experience of the successful contractor to maximise value through vessel and operational window choice.
The anchor blocks were installed in 2014 as foundations for the SeaTricity wave energy device and consist of 6 clump weights, 4 Outer Mooring square clumps at 23 tonnes (dry) / 15 tonnes (wet) and 2 Centre Mooring circular clumps of combined to make a main clump of 126 tonnes (dry) / 80 tonnes (wet).
The vendor is seeking a suitable contractor to:
• Develop a methodology for the complete removal of the mooring clumps and residual mooring equipment from the Celtic Sea Power Site by end of June 2022;
• Undertake all HSEQ and Project planning in line with industry standards,
• Supply suitable vessels, plant, craneage, marine spread, ROV's inclusive of fuel, crew, lubes, stores, dues and other disbursements as required to execute the project plan,
• Transport blocks from site, land ashore and dispose of in line with all environmental and waste management legislation,
• Conduct post-removal ROV survey demonstrating that site is clear,
• Provide project plans, HSEQ documentation, daily progress reports, and final report.
The mooring spread is some 300m or so from the installed electrical infrastructure at the site - which comprises an export cable, hub and 4 x cable tails. A mission critical requirement for the successful contractor will be the minimisation of any potential damage to this infrastructure.
To apply, please download the attached tender documentation and follow instructions therein.
More information
Attachments
-
- CSP_2021_TEN_02-Anchor Block Removal.pdf
- Bidding documents
- Invitation to Tender
-
- Appendix 1 - Seatricity Decommissioning Plan.pdf
- Bidding documents
- Supporting information
-
- Appendix 2 - Visual Survey Report.pdf
- Bidding documents
- Supporting Information
-
- CSP_2021_TEN_02-Clarifications.pdf
- Clarifications to bidders questions
About the buyer
Contact name
Matt Hodson
Address
Chi Gallos Hayle Marine Renewables Business
Hayle
TR274DD
England
Telephone
+44(0)1736800290
Share this notice
Closing: 22 September 2021, 5pm