Published date: 15 January 2018
This notice was replaced on 16 April 2018
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 16 April 2018)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Ground-drainage work - 45111240
Landscaping work - 45112700
Weir construction work - 45247220
Location of contract
Yorkshire and the Humber
Value of contract
£0
Procurement reference
tender_162878/643703
Published date
15 January 2018
Closing date
13 February 2018
Contract start date
19 March 2018
Contract end date
30 June 2018
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
As part of the Hatfield Moor restoration project it is proposed to incrementally increase local water levels to enable re-establishment of the native peatland species and return the currently drained peat land to a natural habitat. To achieve this, various manmade water channels are to be controlled to impound water and saturate the surrounding peat land. This will be facilitated by the installation of cut-off piles and the provision of adjustable tilting weirs that will enable modification of the upstream water level. Two existing weirs located in sites 3 and 4 are to be retrofitted by another sub-contractor prior to commencement.
Therefore, the scope of works is as follows; to supply and install 3 tilting weirs around Natural England's Hatfield Moors Peatland site with associated water control valves across the existing drainage ditches, this includes installation of cut-off sheet piling to support the provision of the tilting weirs and installation of hand rails. Additionally, the works will include an aspect of re-profiling earthworks.
NE are the 'Client' with Mott MacDonald acting as the Principal Designer and Project Manager for NE on this project,works to be carried out by the Principal Contractor, who will be the supplier appointed.
Key Objectives are to deliver the project effectively and ensure that project completion and operational use is achieved by the 30th June 2018.
More information
Links
-
- https://defra.bravosolution.co.uk
- Tender notice
- Link to eSourcing Portal
Additional text
-
Please note that Defra procurement uses an E-tendering system for Procurement activities. This is currently provided by Bravo Solutions. To access appropriate tendering and contractual documents, please access the E-Tendering portal at https://defra.bravosolution.co.uk", ensuring that your registration includes "Defra". If you have any problems with this system, please contact Bravo on their telephone helpline number 0800 368 4850 or by emailing them at help@bravosolution.co.uk. "
About the buyer
Address
Natural England,
Peterborough
PE1 1NG
England
Share this notice
All content is available under the