Published date: 5 December 2017
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Works for complete or part construction and civil engineering work - 45200000
Engineering design services for the construction of civil engineering works - 71322000
Location of contract
Yorkshire and the Humber
Value of contract
£850,000
Procurement reference
DN280473
Published date
5 December 2017
Closing date
17 August 2017
Contract start date
24 September 2017
Contract end date
27 January 2019
Contract type
Works
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway. The crossing position is at the position of an existing bridge which has since been removed. Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.
The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments.
The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT. The design must also include for all requirements of Network Rail in crossing their infrastructure.
The works comprise:
DESIGN STAGE
Ground investigation - scope
Topographical Survey
Environmental Surveys, Statement and Mitigation.
Input to Safety Audits all Stages
C3 and C4 notices and estimates
Liaison with Wakefield Council and outside bodies
Liaison with Network Rail
Network Rail Procedures
Detailed design of the rail bridge including AIP and Category 3 Check.
Signal Sighting Report
Progress meeting attendance
Programme preparation and monthly updates.
Dealing with all technical queries during construction
Network Rail Liaison Design/Query Procedures during Construction.
Construction Phase
1 Construction of the designed bridge.
2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge. This cycleway will tie in to the existing cycleways constructed by others.
More information
Previous notice about this procurement
Castleford to Wakefield Greenway Cycleway Bridge Over Live Railway.
- Opportunity
- Published 6 July 2017
Additional text
-
All documents available from Yortender Web Portal www.yortender.co.uk ref number DN280473
Award information
Awarded date
5 December 2017
Contract start date
11 December 2017
Contract end date
9 June 2019
Total value of contract
£420,850
This contract was awarded to 1 supplier.
AMALGAMATED CONSTRUCTION LTD
Address
BARUGH
S75 1HT
GBReference
Companies House number: 00995892
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Contact name
Brian Thomas
Address
Wakefield One
Burton Street
Wakefield
WF1 2EB
England
highwayscontracts@wakefield.gov.uk
Website
Share this notice
Closing: 17 August 2017