Published date: 6 July 2017

This notice was replaced on 5 December 2017

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 5 December 2017)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Works for complete or part construction and civil engineering work - 45200000

  • Engineering design services for the construction of civil engineering works - 71322000

Location of contract

Yorkshire and the Humber

Value of contract

£850,000

Procurement reference

DN280473

Published date

6 July 2017

Closing date

17 August 2017

Contract start date

24 September 2017

Contract end date

27 January 2019

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway. The crossing position is at the position of an existing bridge which has since been removed. Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.

The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments.

The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT. The design must also include for all requirements of Network Rail in crossing their infrastructure.

The works comprise:

DESIGN STAGE

Ground investigation - scope

Topographical Survey

Environmental Surveys, Statement and Mitigation.

Input to Safety Audits all Stages

C3 and C4 notices and estimates

Liaison with Wakefield Council and outside bodies

Liaison with Network Rail

Network Rail Procedures

Detailed design of the rail bridge including AIP and Category 3 Check.

Signal Sighting Report

Progress meeting attendance

Programme preparation and monthly updates.

Dealing with all technical queries during construction

Network Rail Liaison Design/Query Procedures during Construction.

Construction Phase

1 Construction of the designed bridge.

2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge. This cycleway will tie in to the existing cycleways constructed by others.


More information

Additional text

All documents available from Yortender Web Portal www.yortender.co.uk ref number DN280473


About the buyer

Contact name

Brian Thomas

Address

Wakefield One
Burton Street
Wakefield
WF1 2EB
England

Email

highwayscontracts@wakefield.gov.uk

Website

https://www.yortender.co.uk/