Published date: 16 January 2023
Closed early engagement
Contract summary
Industry
Park and playground equipment - 43325000
Location of contract
East Midlands
Procurement reference
Burton Latimer Skate Facility
Published date
16 January 2023
Closing date
6 February 2023
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
North Northamptonshire Council is seeking to have installed an all new skate facility onto the existing asphalt base of a previous timber skate ramp.
Vision for the new play area.
The site has formally hosted an all timber skate ramp which was removed after it was badly damaged by fire. For longevity purposes local people are seeking a facility that will be more resilient. Concrete is not an option due to the limited space available meaning a concrete facility will be too small, to be useable.
A broad outline design has been agreed loosely based on a single unit featuring two in line halfpipes with other design aspects inbuilt.
1. Scope of Work
1.1 The design, supply and installation of a new skate facility on the site of the previous skate ramp.
1.2 Installation will be onto a full macadam base. However the base might need extending.
1.3 The new facility will be of a design that enables more than one user to skate simultaneously, though not on a single ramp. This will require a twin ramp set up. Its is presumed the ramps will be fore and aft of one another.
1.4 The council does not have a clear design guide and seeks to use the expertise of the supplier to establish an innovative design
More information
Attachments
-
- Burton Latimer Skate Facility .docx
- Needs assessment
- Attached is a broad specification that we are seeking to obtain proposed designs and estimated budgets to inform the procurement process
About the buyer
Contact name
Dave Lane
Address
The Cube,George Street
CORBY
NN168TL
England
Share this notice
Closing date: 6 February 2023