Published date: 12 February 2024
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Site preparation work - 45100000
Works for complete or part construction and civil engineering work - 45200000
Building installation work - 45300000
Location of contract
SG18 9DX
Value of contract
£700,000
Procurement reference
Whole site SALIX works
Published date
12 February 2024
Closing date
15 March 2024
Closing time
12pm
Contract start date
1 April 2024
Contract end date
30 August 2024
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Bedford College is seeking a fixed price design & build tender to carryout whole site SALIX related works at Shuttleworth College. The campus comprises of a series of specialist teaching facilities; support buildings and two student residential blocks [Halls of Residence (HoR)]. Much of the site is heated by oil and this project is designed to substantially decarbonise the estate.
The tender shall exclude principal contractor duties [performed by another contractor directly appointed by Bedford College] and the provision of site welfare.
Set out below are the works that form this tender.
1. Provide stage RIBA 5/6 design services
2. Supply and install new buried district heating pipework.
3. Strip out the plantroom 1 [see plan b]
4. Design and install a new district heating.
5. Design and supply all equipment in plantroom 1 [adjacent to the ZEC -see note 1]
6. Update all the internal heating in the Russell Hall.
7. Install upgrade the electrical supplies to the new plant & HoR.
8. Design, supply and install new plantroom 2 slab [see note 2].
9. Design; supply and install all equipment in plantroom 2 [see note 4].
10. Connect pipework and electrical power to the ASHP equipment adjacent to plantroom 2. [see note 3}
More information
Attachments
-
- V2 ITT SALIX works excluding the refurbishment of the Halls of Residence 06 Feb 2024 - Copy.docx
- Technical specifications
- See embedded WeTransfer link for the contract documents in the file
Additional text
-
Wetransfer link to contract documents
About the buyer
Contact name
Mark Eustace
Address
Cauldwell Street
Bedford
MK429AH
England
Telephone
07977123039
Share this notice
Closing: 15 March 2024, 12pm