Published date: 17 October 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Contract summary
Industry
Earthmoving and excavating machinery, and associated parts - 43200000
Earthmoving machinery - 43210000
Civil engineering machinery - 43310000
Excavating and earthmoving work - 45112000
Earthmoving work - 45112500
Hire of earthmoving equipment with operator - 45520000
Location of contract
Any region
Value of contract
£100,000,000 to £250,000,000
Procurement reference
C4N101112350
Published date
17 October 2025
Closing date
31 October 2025
Closing time
5pm
Contract start date
4 January 2027
Contract end date
8 December 2028
Contract type
Works
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The scope of works for this package is the bulk excavation of made ground, alluvial material and crag sand from the Main Construction Area (MCA) and transportation to either the suitable material stockpiles or unsuitable material disposal areas within the Temporary Construction Area (TCA), to allow for the placement of backfill material for the nuclear plant building foundations. The scope will also include for all material testing required by the specification and the management of the stockpiles and unsuitable material disposal areas. The backfill placement (not part of this scope) will commence in available areas while the bulk excavation is still in progress within the MCA. The essence of the bulk excavation operation, together with the subsequent backfill placement, is to enable commencement construction of Units 1 and 2 on the earliest practicable dates.
The bulk excavation quantities, by type are:
Made Ground including Crag Sand - 912,000 m3
Alluvial Deposits, including peat - 914,000 m3
Crag Sand - 1,443,000m3
The key elements of the scope are:
Bulk Excavation:
Excavation and loading into transport vehicles (typically 45T all -terrain dump trucks) of made ground, alluvial deposits and Crag sand within the MCA.
Assessment of material suitability or otherwise (jointly with CWA) including testing as necessary.
Marshalling and management of vehicles and equipment within the MCA.
Maximising excavation of the three primary material types, recognising that excavation at the interface between layers will result in some mixing.
Transport and Discharge:
Transport to the storage or disposal locations within the TCA, using the segregated heavy haul road. This haul road will be managed by the CWA and will be used primarily by material-hauling vehicles for the bulk excavation works and backfilling operation.
Discharge as directed by the stockpile managers (management of the suitable material stockpiles and disposal areas will be by the CWA).
Testing to verify compliance with the specification, in accordance with the approved Quality Plan.
Shaping and compaction of stockpiles and disposal areas, in accordance with the specification and CWA direction
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=101112364
- Tender notice
- Please follow this link to view the notice.
Additional text
-
It will be beneficial for you to describe your business as mush as possible and highlight where you can help us to achieve our values described above
How to apply
Follow the instructions given in the description or the more information section.
About the buyer
Contact name
Bryan Jenkinson
Address
90 Whitfield Street
London
W1T4EZ
UK
Telephone
07590353416
Share this notice
Closing: 31 October 2025, 5pm