Published date: 10 April 2025

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 25 April 2025, 12pm

Contract summary

Industry

  • Piling - 44212400

  • Civil engineering support services - 71311100

Location of contract

London

Value of contract

£2,500,000 to £5,000,000

Procurement reference

C4N92697960

Published date

10 April 2025

Closing date

25 April 2025

Closing time

12pm

Contract start date

6 April 2026

Contract end date

1 December 2028

Contract type

Works

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

WP 15.04 IEP Access and Retaining wall

Scope
The scope consists of two key components:
A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project.
A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment.

The following will be required:
Detailed design, supply and installation of the above scope.
Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels.
Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction.
Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements
IEP Depot Access Route (Stage 2) - the ramp
The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements.
IEP Depot Retaining Wall
Construction of a new bored piled retaining wall supporting the embankment to the south west corner of the IEP Depot.
Piling, plunge columns, concrete planks, masonry finish, backfilling, RC concrete
Could separate our piling/plunge columns from other works
Piling could be incorporated into the highways scope

Utility diversions to enable works above
Several existing utilities running through the IEP Depot will need to be diverted or managed before major civils and excavation works can commence. These include:
Foul sewer
Multiple LV electricity supplies
Telecoms


More information

Links


About the buyer

Contact name

Manish Tailor

Address

Astral House Imperial Way
Watford
WD244WW
UK

Telephone

07738982498

Email

supplychain@bbvsjv.com