Published date: 31 October 2024

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 15 November 2024, 5pm

Contract summary

Industry

  • Electrical equipment and apparatus - 31600000

  • Valves and tubes - 31711400

  • Parts of air or vacuum pumps, of air or gas compressors - 42124300

    • Parts of gas compressors - 42124340

    • Control valves - 42131142

    • Gas-cylinder outlet valves - 42131170

    • Gas filters - 42514320

Location of contract

North West

Value of contract

£0

Procurement reference

20241031100816-124934

Published date

31 October 2024

Closing date

15 November 2024

Closing time

5pm

Contract start date

16 November 2024

Contract end date

17 November 2024

Contract type

Supply contract

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The SMF is used to transfer material to the AHF facility. It must be purged with nitrogen (N2) prior to export from the AHF to protect the SMF internals. The nitrogen purge system has been designed for this purpose. It comprises several panels with valves and instruments, connected by pipework. The gas supply is provided from standard transportable gas bottles. Specification Outline This specification defines the manufacturing and delivery requirements for the principal pipework panels for performing the N2 purge of the SMF. This document has been produced with reference to the client design requirement specification and the functional specification. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design it is considered unnecessary for any further design except that necessary by the fabricator for manufacture. This specification defines the manufacturing, works testing and delivery requirements for the SMF Nitrogen Purge System Test Aid. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design, it is considered unnecessary for any further design except that necessary by the contractor for manufacture (e.g. profile drawings for stainless steel plates).


About the buyer

Contact name

Izak Cartain-Farish

Address

Chadwick House, Birchwood Park
Warrington
WA3 6AE
ENG

Telephone

+44 01925933825

Email

Izak.Cartain-Farish@uknnl.com

Website

https://www.nnl.co.uk/