Published date: 16 October 2020
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction, foundation and surface works for highways, roads - 45233000
Location of contract
Yorkshire and the Humber
Value of contract
£185,000
Procurement reference
NYCC001-DN490676-42189042
Published date
16 October 2020
Closing date
28 August 2020
Closing time
12pm
Contract start date
28 September 2020
Contract end date
8 November 2020
Contract type
Works
Procedure type
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Treatment of the footways and carriageway on U329 Maiden Greve. Works consist of 20mm, 30mm and 70mm deep footway resurfacing including replacement of damaged kerbs along inner curve of carriageway, raising low kerbs at footway crossings and replacement/resetting of iron works, and one section of carriageway patching/reprofiling at a failed area of carriageway.
Treatment of the footways and carriageway on U332 Middlecave Road. Works consist of 70mm deep footway resurfacing, replacement of damaged kerbs along inner curve of carriageway, replacement of service covers, installation of edging kerbs, re-setting of channels, replacement of kerbs and reprofiling carriageway at uncontrolled crossing, and resurfacing at 50mm deep of a vehicle access at the school.
Treatment of the footways and carriageway on U336 Mount Crescent. Works to include kerb replacement and footway re-surfacing at 20mm and 100mm depths, carriageway patching at 100mm deep and reinstatement/refreshing of road markings between the traffic signals at Newbiggin junction to Middlecave Road junction.
Treatment of the footways on U362 Orchard Road. Works consist of 20mm and 70mm deep footway resurfacing, replacement of damaged kerbs, raise low kerbs at driveway crossings and repair damaged footways at driveway crossings, and installation of edging kerbs. Also included is perforation of a section of footpath and reinstatement to a grassed area at Bramble Walk and construction of 220mm deep Type 1 footway to replace the removed section along the edge of carriageway. Existing ironworks to be adjusted to be replaced/reset to accommodate new footway levels.
Treatment of the carriageway and footway on Russett Road. Works consist of kerb and channel replacement at two short sections on Russett Road and reinstatement/repair of the footway areas behind the kerbs. works also include milling to a depth of 40mm two sections of carriageway which have settled and reprofiling the carriageway with surfacing and regulating.
Award information
Awarded date
8 September 2020
Contract start date
28 September 2020
Contract end date
8 November 2020
Total value of contract
£185,147.27
This contract was awarded to 1 supplier.
CEMEX UK Operations Limited
Address
CEMEX House, Coldharbor Lane, Thorpe,Egham, Surrey, TW20 8TD
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Address
North Yorkshire County Council
County Hall
Northallerton
DL7 8AD
England
Website
Share this notice
Closing: 28 August 2020, 12pm