Published date: 12 July 2021

Last edited date: 23 July 2021

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 2 August 2021, 12pm

Contract summary

Industry

  • Sensors - 35125100

Location of contract

M5 4WT

Value of contract

£5,000 to £8,000

Procurement reference

UoS/WS/20/21/QTR4/air velocity measurement equipment

Published date

12 July 2021

Closing date

2 August 2021

Closing time

12pm

Contract start date

1 September 2021

Contract end date

31 August 2022

Contract type

Supply contract

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford, Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energy-house ). A video of the project can be found here
https://www.youtube.com/watch?v=oP3bsXeQKYU
EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features:
• 2 large chambers capable of having 2 family homes built in each one (4 homes in total)
• Temperature controlled to within 0.5 °C from -20°C to +40 °C
• Wind, rain, solar radiation and snow can be generated
• These conditions provide testing facilities for housing covering 95% of the global population.
The Energy House 2 Project has a requirement to measure air velocity in a chamber environment. This will range from air movement provided by wind machines through to light air movement from
the HVAC units providing cooling and heating to the chamber. Another requirement will be to use air flow inside buildings to inform thermal comfort calculations.
For full tender documentation please go to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home


More information

Additional text

Please send all correspondence to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home


About the buyer

Contact name

Winnie Shek

Address

5th Floor,Maxwell Building, University Of Salford
SALFORD
M54WT
England

Email

W.S.Shek@salford.ac.uk