Published date: 22 October 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Contract summary
Industry
Electrical installations for railways - 34632300
Mechanical engineering installation works - 45351000
Installation services of electrical and mechanical equipment - 51100000
Mechanical and electrical engineering services - 71334000
Location of contract
North West, Any region
Value of contract
£250,000 to £500,000
Procurement reference
C4N101516662
Published date
22 October 2025
Closing date
28 October 2025
Closing time
5pm
Contract start date
17 January 2026
Contract end date
18 September 2026
Contract type
Works
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study.
The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge.
At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station.
There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation.
The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage.
Scope includes but not limited to:
Installation of Mains Distribution/Lighting control cubicle
Installation of Submains
Installation of finals circuits
Installation of Lighting bollards
Installation of Earthing and Bonding
Fuse upgrades within DNO
Testing and commissioning
Inspection and Test Plan
Ellipse updates
O&M Manual
Red line Drawings
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=101516673
- Tender notice
- Please follow this link to view the notice.
How to apply
Follow the instructions given in the description or the more information section.
About the buyer
Contact name
Mark Thompson
Address
2nd Floor Optimum House
Clippers Quay
M503XP
UK
Telephone
07880787625
Share this notice
Closing: 28 October 2025, 5pm