Published date: 3 March 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Concrete - 44114000
Shutters - 44221400
Installation of shutters - 45421142
Location of contract
London
Value of contract
£1
Procurement reference
C4A50895940
Published date
3 March 2022
Closing date
10 September 2020
Closing time
12pm
Contract start date
6 December 2021
Contract end date
9 January 2023
Contract type
Works
Procedure type
Other: .
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.
Scope of Works
Design, supply and install of formwork and falsework system for the casting of the Carnwath Road shaft beams.
Supply and installing reinforcement.
Placement of free issue concrete.
Temporary works as required.
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Carnwath Road Riverside Site - SW6 3HR
More information
Previous notice about this procurement
Thames Tideway Tunnel - C405 Main Works West - FRC Works to Shaft Beams at Carnwath Road
- Opportunity
- Published 4 September 2020
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=50895949
- Tender notice
- Please follow this link to view the notice.
Additional text
-
Carnwath Road Riverside Site - SW6 3HR
Award information
Awarded date
30 November 2021
Contract start date
6 December 2021
Contract end date
9 January 2023
Total value of contract
£960,434
This contract was awarded to 1 supplier.
Address
Reference
None
Value of contract
£960,434
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Contact name
colin smith
Address
130 Wilton Road
London
SW1V1LQ
UK
Telephone
07976181302
Share this notice
Closing: 10 September 2020, 12pm