Published date: 15 June 2017

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 12 July 2017

Contract summary

Industry

  • Heating, ventilation and air-conditioning installation work - 45331000

  • Mechanical installations - 45350000

Location of contract

UB8 1UW

Value of contract

£80,000

Procurement reference

tender_145590/592924

Published date

15 June 2017

Closing date

12 July 2017

Contract start date

14 August 2017

Contract end date

10 September 2017

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The London Borough of Hillingdon (LBH) intends to replace the boilers and control system at Drayton Court - The Glebe, West Drayton, UB7 9IG.
Drayton Court is a Sheltered Accommodation scheme comprising of 24 one-bedroom flats within the main building. The shared facilities include; laundry lounges and kitchen.

The heating plant room is located on the ground floor rear of the building. Access to the plant room is via a double set of louvered doors.

The buildings heating is served from 3 No. Regency Sangorgio boilers
The hot water to the building is served from 2 x hot water A J Smith gas fired water heaters which are sited within the boiler room. The heating system is commercial and is gravity fed.

THE WORKS. The works shall include all of the works described within the specification documents (Part 1 & 2). This specification shall be read in conjunction with the Employers Requirements, schedules, supplementary documents and any drawing issued which defines the requirements of the proposed works to enable the Contractor to:

a) Prepare and submit a proposal for the Works.

b) Undertake construction and completion of the works.

The Works include, but are not limited to the design, supply, installation, testing, commissioning and hand-over of a complete boiler system and the provision of certification, O&M Manuals and training to the Council's Representatives in charge of the schemes.

Length of contract - The works duration is anticipated to be in the region of 4 - 5 weeks on site.


About the buyer

Address

Civic Centre, High Street
Uxbridge
UB8 1UW
England