Published date: 9 April 2021
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Works for complete or part construction and civil engineering work - 45200000
Location of contract
West Midlands
Value of contract
£1
Procurement reference
C4N54880408
Published date
9 April 2021
Closing date
16 May 2021
Closing time
3pm
Contract start date
13 January 2022
Contract end date
31 December 2026
Contract type
Works
Procedure type
Other: .
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2 under an Early Contractor Involvement contract (ECI). We are currently in stage one of a two stage process.
We are looking to engage with the specialist supply chain whom provide passive relief well works.
Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following:
* Integrity
* Leadership
* Respect
* Safety
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include:
* Making HS2 affordable
* Delivering on promises
* We build with people in mind
* Delivering more than a railway
* Achieving more together
* Creative and challenging
Successfully shortlisted supplier's will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier's may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
On selection, shortlisted supplier's will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence.
BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north.
More about BBV:
* VINCI is the largest contractor in the world
* Balfour Beatty is the largest contractor in the UK
* BBV have been working together for the past 30 years, their first project being the channel tunnel.
For more information please visit our website www.balfourbeattyvinci.co.uk
Overview of the requirement:
• Pressure relief wells within the retaining walls
• Inflow rate: 5L/s per 100m of structure
• Diameter of wells 250mm
• Depth of wells: 15m deeper than final excavation level
• Wells filled with aggregates type 6C
• 2 Wells per row every 20m (best case) or every 5m (worst case) all along Burton Green Tunnel and Burton Green Retaining
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=54880443
- Tender notice
- Please follow this link to view the notice.
Additional text
-
Overview of the requirement:
• Pressure relief wells within the retaining walls
• Inflow rate: 5L/s per 100m of structure
• Diameter of wells 250mm
• Depth of wells: 15m deeper than final excavation level
• Wells filled with aggregates type 6C
• 2 Wells per row every 20m (best case) or every 5m (worst case) all along Burton Green Tunnel and Burton Green Retaining Structure (from area GT5 to area RW1)
• The pressure relief wells would evacuate any artesian pressure that could destabilize the ground during excavation works. Underneath the top slab, transversal ditches would be installed at every row of wells to drain inflow waters from the wells to the edge ditches running at toe of embankments toward the temporary balancing ponds
• The wells are trimmed as excavation works progress toward final excavation level.
• When final excavation level is reached, sleeves of the baseslab thickness are installed at each well location. These sleeves are embedded in the baseslab
• During baseslab works, water is evacuated through baseslab permanent ditches toward exit of tunnel and pumped away.
• When baseslab is complete, the sleeves are sealed with end plates and grouted. At that stage, the structure can withstand the uplift pressure.
About the buyer
Contact name
Matt Munn
Address
BBV HS2 Offices, 11 Brindley place
Birmingham
B1 2LP
England
Telephone
07530492643
Share this notice
Closing: 16 May 2021, 3pm