Published date: 21 August 2025

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.


Closing: 29 August 2025, 12pm

Contract summary

Industry

  • Piling - 44212400

  • Civil engineering support services - 71311100

Location of contract

London

Value of contract

£10,000,000 to £20,000,000

Procurement reference

C4N98553049

Published date

21 August 2025

Closing date

29 August 2025

Closing time

12pm

Contract start date

16 August 2026

Contract end date

1 December 2028

Contract type

Works

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

WP15 Final highways scope

The OOC Lane realignment & Final highways scope package consists of:

Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?)

Installation of any temporary critical highway furniture (e.g. Street Lighting, Barriers) required to carry out the works

Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence.

The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing

All temporary works required for the construction of the works, including any access requirements

Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements

Removal and disposal of all current utilities in the highway.

Installation of OOC Lane footpath retention structures

Installation of any other required Highway Civils

Installation of all highway and foul drainage

Installation of UKPN 132kV & 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works

The removal of any installed temporary works and the construction of the highway

The installation of all highway furniture and its required infrastructure      (traffic lights incl of ducting, islands, street lighting incl of ducting etc)

Removal of temporary works installed by others to facilitate utility connections at the north and south end of the


More information

Links


How to apply

Follow the instructions given in the description or the more information section.


About the buyer

Contact name

Manish Tailor

Address

Astral House Imperial Way
Watford
WD244WW
UK

Telephone

07738982498

Email