Published date: 30 October 2024
Closed early engagement
Contract summary
Industry
Construction work - 45000000
Site preparation work - 45100000
Works for complete or part construction and civil engineering work - 45200000
Engineering works and construction works - 45220000
Roof works and other special trade construction works - 45260000
Building installation work - 45300000
Building completion work - 45400000
Repair and maintenance services - 50000000
Repair and maintenance services of building installations - 50700000
Construction-related services - 71500000
Location of contract
WA3 6GR
Procurement reference
CF-0192900D4L000000iAvzUAE
Published date
30 October 2024
Closing date
22 November 2024
Contract type
Works
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
This Prior Information Notice 5 (PIN 5), without call for competition, is to alert the market that Sellafield Ltd is continuing with market engagement activity for the forthcoming Project and Asset Care Execution (PACE) Contract Opportunity.
This PIN 5 supplements the previous:
• PIN 1 reference CF-0113800D4L000000iAvzUAE
• PIN 2 reference CF-0133500D4L000000iAvzUAE
• PIN 3 reference CF-0155800D4L000000iAvzUAE
• PIN 4 reference CF-0188400D4L000000iAvzUAE; and
• PIN 4A reference CF-0191900D4L000000iAvzUAE
As a result of this fifth PIN and as part of the ongoing market engagement activity, Sellafield Ltd is to provide information to the market in relation to the PACE opportunity, this includes proposed timescales for the PACE procurement, lotting strategy including bidding & award rules; updates in relation to aspects of the commercial model / PACE opportunity arising from PIN 3 feedback; and summary of key commercial principles & incentivisation model. These are set out in the supporting PACE PIN Market Engagement Information document shared via Atamis, as referred to in II.2.14.1 Additional Information.
The majority of the work will take place in operational nuclear facilities and in radiologically controlled areas. The work involves maintaining existing asset condition and providing new asset capabilities when needed.
With the description provided again as high-level examples only, the capabilities that will be required fit broadly into the following work disciplines and service types:
- Civil works, including roofing, painting, fencing, roads and paths etc.;
- Mechanical works, including heating and ventilation, pipework, steelwork etc.;
- Electrical works, including building lighting, alarm systems, instrumentation etc; and
- Project works, including Project, Contract & Cost Management etc.
The proposed strategy for the agreement duration is a 9+6 framework up to a maximum 15-year term.
The value of the work will be subject to ongoing governance and approval on an annual basis, but for planning purposes the mid-range estimate of the anticipated framework value across all the work package categories for the maximum duration of 15 years is £2,400,000,000 (£2,400m).
If you are not already registered on Atamis, you can access using the record reference C17465 by visiting the URL https://atamis-2464.my.site.com/s/Welcome for the PACE PIN 5 Market Engagement Information and the PACE RfI template documents referred to above. If you are interested in providing feedback on proposed contract model construct types, you should again access to Atamis using record reference C17465 and upload your completed RfI template by attaching it to a message using the 'New Messages' functionality. Completed RfIs should be returned by 12:00 on Friday 22nd November 2024.
About the buyer
Contact name
Tony Davis
Address
Hinton House, Birchwood
Warrington
WA3 6GR
GB
Share this notice
Closing date: 22 November 2024