Published date: 13 December 2022
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work - 45000000
Construction work for bridges - 45221100
Bridge construction work - 45221110
Road bridge construction work - 45221111
Location of contract
Yorkshire and the Humber
Value of contract
£0 to £160,000
Procurement reference
20221213160847-104123
Published date
13 December 2022
Closing date
17 January 2023
Closing time
12pm
Contract start date
22 February 2023
Contract end date
21 April 2023
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Nostell Bridge southwest masonry burr wall was subject to impact damage from an errant vehicle resulting in the damage at the location of a feature buttress. The damaged wall has since been made safe and traffic management was installed on the A638 to keep traffic away from the unprotected carriageway edge (single lane running with traffic lights).
The damage revealed that the feature buttress was hollow with rubble infill to approximately carriageway level. Due to extensive cracking and displacement, the brickwork was carefully dismantled to ground level behind the wall to make safe and reclaim the bricks and stone copings for re-use.
The works required to repair the Nostell Bridge Burr Wall include:
• Traffic management
• Partial dismantling of the existing brickwork
• Temporary access track to the back side of the wall (earthworks)
• Site clearance (vegetation)
• Excavation and underpinning existing structure for temporary stabilty
• Piled foundations (contractor designed, possible additional GI required)
• Reinforced concrete pile cap, buttresses and cross beams
• Reconstruction of brickwork parapet using salvaged bricks
• Reconstruction of feature buttress using salvaged bricks and sourcing new bricks as required, recreating the original buttress as best as possible
• Reinstate salvaged coping stones with new precast concrete lintel supports
• Excavate and reinstate existing highway drainage
More information
Links
About the buyer
Contact name
Jonathan Carr
Address
Wakefield One, Burton street
Wakefield
WF1 2EB
ENG
Telephone
+44 1924302144
Website
Share this notice
Closing: 17 January 2023, 12pm