Published date: 13 December 2022

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 17 January 2023, 12pm

Contract summary

Industry

  • Construction work - 45000000

  • Construction work for bridges - 45221100

  • Bridge construction work - 45221110

    • Road bridge construction work - 45221111

Location of contract

Yorkshire and the Humber

Value of contract

£0 to £160,000

Procurement reference

20221213160847-104123

Published date

13 December 2022

Closing date

17 January 2023

Closing time

12pm

Contract start date

22 February 2023

Contract end date

21 April 2023

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The Nostell Bridge southwest masonry burr wall was subject to impact damage from an errant vehicle resulting in the damage at the location of a feature buttress. The damaged wall has since been made safe and traffic management was installed on the A638 to keep traffic away from the unprotected carriageway edge (single lane running with traffic lights).

The damage revealed that the feature buttress was hollow with rubble infill to approximately carriageway level. Due to extensive cracking and displacement, the brickwork was carefully dismantled to ground level behind the wall to make safe and reclaim the bricks and stone copings for re-use.

The works required to repair the Nostell Bridge Burr Wall include:
• Traffic management
• Partial dismantling of the existing brickwork
• Temporary access track to the back side of the wall (earthworks)
• Site clearance (vegetation)
• Excavation and underpinning existing structure for temporary stabilty
• Piled foundations (contractor designed, possible additional GI required)
• Reinforced concrete pile cap, buttresses and cross beams
• Reconstruction of brickwork parapet using salvaged bricks
• Reconstruction of feature buttress using salvaged bricks and sourcing new bricks as required, recreating the original buttress as best as possible
• Reinstate salvaged coping stones with new precast concrete lintel supports
• Excavate and reinstate existing highway drainage


About the buyer

Contact name

Jonathan Carr

Address

Wakefield One, Burton street
Wakefield
WF1 2EB
ENG

Telephone

+44 1924302144

Email

jonathancarr@wakefield.gov.uk

Website

https://www.wakefield.gov.uk/