Published date: 9 August 2018

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 7 September 2018

Contract summary

Industry

  • Ground-drainage work - 45111240

Location of contract

North East

Value of contract

£20,000

Procurement reference

MT212901

Published date

9 August 2018

Closing date

7 September 2018

Contract start date

1 October 2018

Contract end date

14 December 2018

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The Sill Landscape Discovery Centre was completed in June 2017, and it has attracted more than 150,000 visitors in its first year.
As the new infrastructure beds in, some minor works are necessary to reflect the ground conditions that have evolved though the appearance of high water levels and to adapt to traffic use.
The works outlined below sets out to address those items.
Phase 1. Over the last 12 months localised areas of high level ground water have appeared. This can be caused by the natural water table or by compacted ground as a result of the large scale building works over the previous years. Our engineers have detailed local solutions to each high water spot, and these are outlined in these works.
The footpath down to the overflow car park and the overflow car park itself, have also been prone to suffer excess surface water, and as such the construction of some open ditches are included in the Schedule of Works and Drawings.
There is also an opportunity here to extend the current car parking provision, and the creation of an additional 11 spaces are included in this project.
Phase 2. The overflow car park was originally designed for limited use, but such has been the demand for parking, a more substantial access track is required.
As such, phase 2 of the project will be the construction of a solid track around the field, with the desired end result being the appearance of a farm track.


More information

Links


About the buyer

Contact name

Hazel Fitzsimmons

Address

Eastburn
South Park
HEXHAM
NE46 1BS
England

Telephone

+44 1434605555

Email

hazel.fitzsimmons@nnpa.org.uk

Website

http://www.northumberlandnationalpark.org.uk