Published date: 29 March 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Calculation of costs, monitoring of costs - 71244000
Location of contract
Any region
Value of contract
£18,812.83
Procurement reference
tender_198985/946831
Published date
29 March 2021
Closing date
26 February 2021
Closing time
2pm
Contract start date
8 March 2021
Contract end date
31 March 2021
Contract type
Service contract
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The A303 Stonehenge project has been asked to investigate the impacts of adding emergency refuges or an additional hard shoulder within in the Stonehenge tunnel in order to increase tunnel safety over the 3km bored tunnels. This requires an assessment of the incremental cost and schedule versus the current baseline scheme (D2AP tunnel without refuges or hard shoulder).
Two options are to be considered:
- The provision of two lay-byes per tunnel, spaced at 1000m centres (four in total), constructed using SCL techniques, to provide an emergency refuge during traffic emergencies / incidents.
- Increasing the diameter of the tunnels to incorporate a hard shoulder lane over the entire length of the tunnel
The incremental cost and schedule impacts are to be measured vs the current baseline scheme design. This will require establishing a baseline estimate and schedule with a consistent set of assumptions against which the above options can be compared. The assessment is to include development of design and methodology assumptions in consultation with the A303 Stonehenge project team so that the assessment has a robust design, methodology and schedule basis.
The assessment is to include the following activities
- Mobilisation and collection of reference design information for the baseline scheme and definition of the above options
- Confirm scope of assessment and output requirements with the A303 Stonehenge project
- Establishment of cost and schedule estimate for the baseline scheme
- Identification of design and construction methodology for the emergency refuge option
- Identification of design and construction methodology for the emergency refuge option
- Production of cost estimates and outline schedule for each option
- Comparison with baseline scheme and identification of incremental impacts
- Production of report to capture impacts and the design / methodology assumptions. This is to include commentary on risks to delivery of the options.
- Presentation of findings
No design cross sections are available for the above options at this time and these are to be developed as part of the assessment. The level of detail within the assessment should be commensurate a concept design / PCF Options Stage 1 level.
Award information
Awarded date
8 March 2021
Contract start date
8 March 2021
Contract end date
31 March 2021
Total value of contract
£18,813
This contract was awarded to 1 supplier.
Benchmark Estimating
Address
Manchester
Reference
No reference - other
Supplier is SME?
No
Supplier is VCSE?
No