Published date: 21 June 2021

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 23 June 2021, 4:30pm

Contract summary

Industry

  • Surveying instruments - 38296000

Location of contract

United Kingdom, Isle of Man, Channel Islands

Value of contract

£101,000 to £150,000

Procurement reference

C4N55948445

Published date

21 June 2021

Closing date

23 June 2021

Closing time

4:30pm

Contract start date

26 August 2021

Contract end date

27 August 2021

Contract type

Supply contract

Procedure type

Competitive quotation (below threshold)

The buyer selects a group of potential suppliers to invite to tender.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Supply and delivery of temporary survey equipment (Gyromat or similar).

• The tunnels are High Speed rail infrastructure, therefore the alignment consists of straight lines and very smooth curves (minimum curve radius ~2.5km). The maximum gradient is 2.5% and the depth from surface varies between 20-90m along the route.
• Control network with baselines up ~1km in length will be available in the surface near the tunnel portals (walking distance). The network to be used for launching the TBMs is currently being designed. For the tunnel survey control, brackets on the side of the ring segments, left and right side (alternating pattern) are to be installed.
• Longest distance between consecutive brackets ~120m, but baselines of up to 500 m are feasible even on the curves
• The required accuracy of the alignment at any point and at the breakthrough point is 75 mm horizontally/vertically
• First TBM to be Launched mid-April this year and to be operating for ~3.5 years until breakthrough.
• All our survey works take place using a SnakeGrid projection reference system.

The package will be competitively tendered and assessed against a split between commercial (price) and non-commercial/technical criteria - The intention of the Contractor that these works will be tendered as 1 enquiry, however we reserve the right to split the works and award the package to more than 1 sub-contractor.
In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.


More information

Links


About the buyer

Contact name

Olivia Whaley

Address

Euston House, 24 Eversholt Street
London
NW1 1AD
England

Telephone

01698647999

Email

e.thanopoulou@alignjv.com