Contract summary
Industry
Laboratory furniture - 39180000
Laboratory benching - 39181000
Laboratory building construction work - 45214610
Installation services of laboratory equipment - 51430000
Laboratory services - 71900000
Project-design services other than for construction work - 79421200
Design support services - 79933000
Location of contract
CA14 3YQ
Value of contract
£0 to £700,000
Procurement reference
20230526145012-124934
Published date
26 May 2023
Closing date
26 June 2023
Closing time
5pm
Contract start date
27 June 2023
Contract end date
28 June 2023
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL's Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL's Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability: -
• 4 off. Fume hoods
• Double Dissolver
• Precipitation Vessel
• Filtration Boat
• Furnace
• Evaporator
• Waste Liquor collection vessel
• Sink
• Foul waste drainage system
• Deionisation machine
• Room extraction ventilation system
• Fume hood ventilation
• Bottle fed argon and nitrogen supply
• Hydrogen monitor
Laboratory development
The functional requirements are detailed in Project functional Specification: Salt Clean-up Development Facility (MOD12036/06/96/01 issue 1).
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.
More information
Links
About the buyer
Contact name
Craig Greenough
Address
Chadwick House, Birchwood Park
Warrington
WA3 6AE
ENG
Telephone
+44 01772965112
Website
Share this notice
Closing: 26 June 2023, 5pm