Published date: 7 March 2025

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 14 March 2025, 5:30pm

Contract summary

Industry

  • Structures of bridges - 44212120

  • Bridge construction work - 45221110

  • Railway bridge construction work - 45221112

Location of contract

Any region

Value of contract

£500,000 to £1,000,000

Procurement reference

C4N91350657

Published date

7 March 2025

Closing date

14 March 2025

Closing time

5:30pm

Contract start date

4 August 2025

Contract end date

2 September 2025

Contract type

Works

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate.

The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks.

The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete.

The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.


More information

Links


About the buyer

Contact name

Louise Appleton

Address

Hiview House, Highgate Road
London
NW51TN
UK

Telephone

07594514782

Email

louiseappleton@murphygroup.co.uk