Published date: 27 May 2020

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 22 June 2020

Contract summary

Industry

  • Electricity - 09310000

  • Electric switchboards - 31214500

  • Electrical installation work - 45310000

    • Electrical wiring and fitting work - 45311000

    • Electrical services - 71314100

Location of contract

London

Value of contract

£150,000 to £200,000

Procurement reference

tender_241492/858204

Published date

27 May 2020

Closing date

22 June 2020

Contract start date

2 November 2020

Contract end date

21 December 2020

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The electrical works shall include the supervision; co-ordination; supply and delivery; off-loading; storing; erection; installation; testing and commissioning, of the services associated with the project, all as contained within this specification.
The Works shall include the following:-
a. Detailed programming of the works to minimise disruption to residents (no residents will be decanted during these works).
b. Engagement of UKPN and EDF as required for, the replacement of the main service head, isolating/reenergizing and reconnections of electrical meters.
c. Installation of new BNO installation and striping out of the old rising and lateral mains system in a phased manner. New cable to be XLPE/LSF single core sized as appropriate, and installed within metallic/PVC trunking/conduit, to comply with current BS7671 and all relevant standards.
d. Replacement of TPN Lift supply and installation of appropriate isolator. New cabling to be XLPE/SWA/LSF size as appropriate and installed in existing rising duct, to comply with current BS7671 and all relevant standards.
e. Installation of main and supplementary bonding as required to all non-electrical services and all extraneous and/or exposed conductive parts.
f. Extension of existing intake cupboard to provide space for housing new distribution equipment.
g. Containment installation (lateral mains). This will require installation of metallic trunking routed from intake cupboard to each dwelling.
h. Complete removal of relevant redundant cabling and redundant containment once new installation is in place.
i. Builderswork, making good and fire stopping of any holes through walls, floors and fire compartments.
j. Testing, commissioning and certification of the electrical systems relating to the BNO Installation.
k. Provision of O&M Manuals.
l. Provision of Spares.
m. Instruction/training of Client's staff.


More information

Links


About the buyer

Contact name

Sandeep Kapoor

Address

Unit A, 292 Kensal Road
London
W10 5BE
England

Telephone

07877953423

Email

Sandeep.Kapoor@rbkc.gov.uk