Published date: 18 January 2023
This notice was replaced on 2 September 2024
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 2 September 2024)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work - 45000000
Location of contract
South East
Value of contract
£11,000,000
Procurement reference
BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor
Published date
18 January 2023
Closing date
2 March 2023
Closing time
12pm
Contract start date
1 November 2023
Contract end date
30 April 2025
Contract type
Works
Procedure type
Restricted procedure (above threshold)
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark. At 865m
long in total it is one of the longest cast-iron structures in the world and an admired piece of
Victorian architecture, integral to the Eastern Seafront. It is also a significant Grade 2* listed
structure within the rich heritage context of the wider coastal city. Phase 1 of the Madeira
Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent
steps and the Shelter Hall / Concord 2.
The cast iron structure forms a backbone describing the historic development of the
seafront. Addressing the sea and the beach firmly braced against the rising East Cliff wall
rising behind. It is a 'backdrop': designed and intended to be used and inhabited by the
residents of the city for all manner of events and social occasions; for quiet enjoyment,
outdoor exercise and for viewing.
The structure is now deemed unsafe and public access has not been possible for a number of
years, due its condition.
The Phase 1 project includes the following elements of works:
• Conservation and repair of the historic cast iron structure.
• Conservation and management of the historic Japanese Spindle green wall [dating from
1872], and other planting associated with the Green Wall.
• Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure
public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure.
• Public realm landscaping to both the terrace deck above and the promenade walkway
below, including new hard surfacing, soft landscaping and street furniture.
• Local improvement to Madeira Drive, via new pedestrian crossing points.
• New lighting and servicing infrastructure
• Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2
building, to allow its continued historic function as the original means of step-free access to
the terrace.
• A new external public lift
About the buyer
Contact name
Procurement Team
Address
Hove Town Hall,Norton Road
HOVE
BN32LS
England
Telephone
01273 291949
Share this notice