Published date: 24 September 2025

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 15 April 2025, 3pm

Contract summary

Industry

  • Surface work for highways - 45233210

Location of contract

North East, North West

Value of contract

£181,335.24

Procurement reference

tender_506402/1518568

Published date

24 September 2025

Closing date

15 April 2025

Closing time

3pm

Contract start date

13 June 2025

Contract end date

6 February 2026

Contract type

Works

Procedure type

Call-off from a framework agreement

A mini-competition or direct purchase from a pre-established framework agreement.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60
Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel
beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a
longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment.

The structure was commissioned in 1996 and has a design capacity of HA + 45HB.
During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing.
According to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise
direction, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser
repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There
is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore,
a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse.

Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology
and programme. The detailed design of the scheme has been completed by WSP


Award information

Awarded date

15 April 2025

Contract start date

13 June 2025

Contract end date

6 February 2026

Total value of contract

£181,335.24

This contract was awarded to 1 supplier.

BREEDON COLAS LIMITED

Address

Pinnacle House Breedon Quarry, Breedon On The Hill, Derby, England, DE73 8AP

Reference

Companies House number: 14460477

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Address

Three Snowhill
Birmingham
B4 6GA
England

Email

ADProcurement@nationalhighways.co.uk