Published date: 5 May 2021

This notice was replaced on 5 May 2021

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 16 November 2021)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000

Location of contract

South West

Value of contract

£350,000

Procurement reference

CLTD001-DN541952-76746580

Published date

5 May 2021

Closing date

27 May 2021

Closing time

4pm

Contract start date

1 November 2021

Contract end date

3 December 2021

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Corserv on behalf of Cormac Solutions Ltd would like to appoint a suitably qualified and experienced contractor to *Scope of Works (please utilise additional sheets if necessary):

To provide support to the management team to provide the client with a detailed proposal, sequence and programme for the removal and replacement of Bodmin General and Boscarne Span Bridges.

To design and provide drawings of the required temporary works.
To provide a copy of required lifting plans

To complete the required vegetation clearance on and around the two bridges

The dismantle of edge beams and parapets, to be removed off site for grit blasting, repair and recoating with protective paint.

To install the required temporary works to enable Bodmin General Bridge to be demolished

To demolish the existing Bodmin General Bridge and dispose of arisings

To install the required precast concrete beams, steel reinforcement, service ducts, iron edge beams and formwork to cast the new concrete bridge deck.

To spray apply a waterproofing system to the top and ends of the concrete bridge deck.

To install a perforated pipe & clean stone wrapped in terram, to provide drainage at both ends of the bridge deck

Reinstatement of excavation at both ends using 6N1

To lay and compact a layer of type 1 (803) across the top of both excavated areas and the bridge span to enable the reinstatement of the carriageway. Surfacing works by others.

Repeat the above process for the Boscarne Bridge replacement

Specific Works location
Bridges span Bodmin and Wenford railway line
Residential Area

Site Specific Details (Incl. Restrictions)

Works under a road closure (TM booked & provided by Cormac)

Existing pedestrian footbridge to remain open

Working below structure

The intention is to award the contract to the most economically advantageous tenderer based on 30% Quality and 70% Price. To access the online question template and supporting documents, express an interest and then click the "start my response" button


About the buyer

Contact name

Gemma Parker

Address

Corserv Head Office
Higher Trenant Road
Wadebridge
PL27 6TW
United Kingdom

Telephone

+44 1872324560

Email

gemma.parker@corservltd.co.uk

Website

https://www.corservltd.co.uk