Published date: 24 March 2023
Last edited date: 17 May 2023
This notice was replaced on 29 August 2023
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 29 August 2023)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Christmas tree lights - 31522000
Maintenance services of public-lighting installations and traffic lights - 50232000
Event services - 79952000
Location of contract
TF12 5EL
Value of contract
£0
Procurement reference
BTC_Christmas_lights2023
Published date
24 March 2023
Closing date
1 June 2023
Closing time
11pm
Contract start date
1 November 2023
Contract end date
6 January 2024
Contract type
Supply contract
Procedure type
Single tender action (below threshold)
A direct contract with a single supplier, without competition.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Details to assist with the tender: Broseley Town Council undertakes the Christmas Lights illuminations within Broseley annually with the aim of enhancing the Town at Christmas time to make it a nicer environment for residents. This tender is for the installation, maintenance, dismantling, and testing of the Christmas Lights. EVALUATION AND AWARDING OF CONTRACT The contract will be awarded to the company that complies with all written requirements, has satisfactory references and offers the best value for money. This contract will be evaluated on the following basis: ➢ Demonstrated ability to deliver similar projects to a high quality 25% ➢ Price fit within the budget £25% ➢ Quality and Value for money 30% ➢ Use of local resources and skills 20% PAYMENT Payment for the completed project will be made to the Contractor on satisfactory completion of works. CONTRACT HEALTH & SAFETY Contractors must comply with all relevant H & S legislation. Measures must be taken to minimize any risk to the public. For example, tools must not be left on the pavement where they could present a trip hazard. Any motor vehicle or plant machinery used must be parked so as not to contravene any parking restrictions and/or present any obstruction to other road users and the public. The Contractor must adhere to the relevant codes of practice and regulations. In particular, the erection, testing and maintenance of the installation must be carried out in accordance with the latest Wiring Regulations (BS 7671) and undertaken by a competent person as laid out in those regulations. The successful contractor will be expected to produce a Health & Safety Information prior to installation. This will include: • Risk Assessment • Method Statement
2
• Schedule of Works • Any other relevant documents such as General Health & Safety at Work Policy, accreditation certificates and staff training certificates. INSURANCE It is a requirement that the contractor is adequately insured, with public liability cover. A copy of your current insurance certificate must be included in with tender response. VARIATIONS Any variations to the contract will be notified to the Contractor by the Town Clerk and agreed in writing between the two parties. ADDITIONAL INFORMATION It will be expected that the Contractor, prior to submitting a tender will have made any necessary site visits and satisfied their self of any access arrangements and any other necessary information required and that the tender is fully inclusive of all costs. A Town Council representative will monitor the work carried out on a regular basis, and any concerns will be reported to the Town Clerk who will agree an appropriate course of action with the Contractor. All tenders received will be considered by the Town Council on 13 June 2023 and all tenders will receive a response from the Town Council week commencing week commencing 30 June 2023.
More information
Attachments
-
- Label.pdf
- Tender notice
-
- Tender For Christmas Lights Installation.pdf
- Tender notice
Additional text
-
INSTALLATION
Installation testing must begin on 1 November 2023.
The lights must be in working order in good time, and no later than ONE WEEK PRIOR to the notified switch-on date of Saturday 25 November 2023.
The work must be undertaken in a manner that causes little disruption to traffic both vehicular and pedestrian, as well as with consideration for the environment. Given the traffic congestion experienced in Broseley during the day.
The contractor must be present on the day of the switch-on Saturday 25 November 2023 to manually switch on the lights after a countdown. The Christmas Lights Committee will be available to assist on the day. Thereafter the lights need to be set to their automatic timers which result in their coming on at 4pm and going off at 10pm weekdays, and 4pm - 11pm weekends.
Install Requirements:
1. Electric testing of lights to current standards
2. Check of all anchor points
3. Cost of any replacement anchor points
4. Testing of all electric feeder pillars
5. Install and activate 23 sets of pea lights to memorial garden
6. Install and activate 1 set of lights to fir tree within the memorial garden
7. Install and activate 1 set of pea lights to the tree on the square
8. Install features to the poles within the memorial garden
9. Install "welcome to Broseley" sign across high street (Victoria Hall to Bridal Shop)
10. Install festoons to front of Harwood's building & butchers' shop
11. Install string lights from the top of church street zig-zagging up the high street to the social club
12. Removal of all lights
13. The cost of all-inclusive call outs during the festival period for lights erected and maintenance checks
14. Attendance at switch on event
15. Installation of 2x snow fall column motifs
MAINTENANCE
The lights will need to be maintained during the period that they are on display. We require two scheduled run throughs of the display to check everything is functioning properly and to attend to any minor faults. In addition, we require a call out within 24 hours for major faults including, but not limited to, complete failure of a motif or light string, extreme damage caused through vandalism, storms or road traffic accident.
Additional call out charges must be stated on the schedule.
All anchor points tested.
DISMANTLING
The lights are to be dismantled and removed as soon after 6 January each year as possible, but no later than 12 January each year.
TESTING
All lights and features are to be tested during down time and any minor work required such as replacing bulbs and fixing faulty connections is to be undertaken. All lights and features must be fully functioning prior to installation.
The contractor will notify BTC immediately of any defective lights and features that require major repair at additional cost or that cannot be repaired so replacement can be considered in good time.
To cost all items individually.
Jenna Munday
01952 882172
About the buyer
Contact name
JENNA MUNDAY
Address
The Library Building,Bridgnorth Road
BROSELEY
TF125EL
England
Telephone
01952 882172
Share this notice