Published date: 26 August 2021
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work - 45000000
Construction work for bridges - 45221100
Railway bridge construction work - 45221112
Location of contract
West Midlands
Value of contract
£6,000 to £15,000
Procurement reference
C4N57634317
Published date
26 August 2021
Closing date
3 September 2021
Closing time
5pm
Contract start date
1 December 2021
Contract end date
30 December 2021
Contract type
Works
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Birdproofing of the SAS13 Bridge existing flat span.
The Existing Flat Span of the SAS13 Bridge is a Parallelogram in Shape on Plan, the Edge Beams are 21m Long and the Bridge is 8.4m Wide. The Bridge is supported upon 2 no. Abutments, each approximately 9m Long. Tenderers will provide a proposal to install Bird/Nesting Deterrent Measures to both the Underside of the Bridge and Abutment Shelves. It is envisaged the deterrent measures could be Netting, Spikes, Metal Strands, etc. The exact method and material may be suggested by the contractor for acceptance.
The SAS13 Flat span runs above the DBP3 lines, therefore all access to the Underside of the Bridge would be via Network Rail ROTR or Possession working. All operatives will require Personal Track Safety (PTS) Accreditation as works are on-or-near the line.
Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete.
The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include:
- Quality
- Sustainability
- Competence
- Commercial Price
- Etc
Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team.
Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3).
The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=57634319
- Tender notice
- Please follow this link to view the notice.
About the buyer
Contact name
Tom Goodwin
Address
Maple Cross House Denham Way
Rickmansworth
WD39SW
UK
Telephone
07341127310
Share this notice
Closing: 3 September 2021, 5pm