Published date: 21 August 2024

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 21 June 2024, 12pm

Contract summary

Industry

  • Construction work - 45000000

Location of contract

England

Value of contract

£470,000

Procurement reference

CC001-DN724326-54543667

Published date

21 August 2024

Closing date

21 June 2024

Closing time

12pm

Contract start date

23 August 2024

Contract end date

29 July 2025

Contract type

Works

Procedure type

Other

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The existing Buckbarrow Bridge is a two-span structure with the superstructure consisting of two equal spans of 8.75m. The bridge carried the U4064 County Road over Buckbarrow Beck (Non-main river). A load assessment of the bridge was carried out in May 2022, which identified significant failings in the original load assessment which was undertaken in 2000. Following this, an Interim Measures Feasibility report was produced which identified the need for a 3-tonne weight limit and a fortnightly inspection regime. During the course of these fortnightly inspections the deterioration of the bridge began to accelerate, and a decision was made to close the bridge on August 30th, 2023, to safeguard the public. A partial demolition of the existing structure has been commissioned by Cumberland Council and is expected to be concluded in advance of this contract commencing. The bridge deck superstructure is to be demolished by the demolition contract, the substructures (central pier, abutment pad foundations, wing walls / training walls) will be retained and demolished as part of this contract. The successful contractor will be responsible for the detailed design, AiP and Technical Approval Authority (TAA) sign-off of the replacement structure and associated elements including parapets, scour protection and surfacing, demolition of the remaining substructure elements and construction of the new structure. Following completion of this scheme the U4064 will be reopened to highway traffic.
This project is to be let as a construction contract with Contractor designed elements.


Award information

Awarded date

20 August 2024

Contract start date

23 August 2024

Contract end date

29 July 2025

Total value of contract

£370,659.16

This contract was awarded to 1 supplier.

Cubby Construction Ltd

Address

Units H&L, Knights Drive
Kingmoor Park Central
Carlisle
CA6 4SG

Reference

None

Supplier is SME?

Yes

Supplier is VCSE?

No


About the buyer

Address

Cumbria House
107 - 117 Botchergate
Carlisle
CA1 1RD
United Kingdom

Email

procurement.capital@cumberland.gov.uk

Website

https://www.cumberland.gov.uk/