Published date: 13 October 2021
This notice was replaced on 17 October 2022
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 17 October 2022)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Steel - 14622000
Tunnelling machinery - 43123000
Concrete - 44114000
Concrete products - 44114200
Tunnelling works - 45221247
Structural steelworks - 45223210
Reinforced-concrete structures - 45223500
Concrete work - 45262300
Reinforced-concrete work - 45262310
Location of contract
London
Value of contract
£2,600,000 to £5,000,000
Procurement reference
C4N58530177
Published date
13 October 2021
Closing date
19 October 2021
Closing time
6:58pm
Contract start date
4 March 2022
Contract end date
30 June 2023
Contract type
Supply contract
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The scope for this package is the supply of SCL Formworks. SCS require lining shutters to construct cast insitu concrete tunnel secondary linings.
The works will include:
*Technical design
*Design to British or European Standards.
*Provision of calculations and drawings, including design of all temporary loads such as concrete pressure and uplift/floatation without penetrations through the shutter or waterproof membrane.
*Provision of erection sequence /shop drawings
*Manufacture and delivery of formwork to SCS jobsites, at multiple locations along the HS2 S1 and S2 contract.
*Initial assembly of the system in the tunnel.
*Buy-back of the system.
The works are split in to 3no. separate packages:
1) Cross Passages
a. Access limited to cross passage by openings in the TBM running tunnel of 2.850 x 1.900m
b. Secondary lining invert will have previously been cast flat.
c. Secondary lining thickness of ~250mm.
d. Shutter internal dimensions ~2.7m high x 3.3m wide.
e. Cast in a single pour.
f. Cross passages varying in length from 5-5.8m. The shutter should be adaptable to suit this length, and the combined TBM horizontal driving tolerances from both bores
g. Due to access limitations for mechanical lifting, the shutter should take into consideration UK manual handling legislation.
h. Required for July 2022
2) Old Oak Common SCL Tunnels
a. Secondary lining shutters to facilitate the construction of both the Upline and Down running tunnels concurrently (2no complete sets of panels and carriages required)
b. Shutter internal dimensions ~10m diameter.
c. Formwork to be adaptable for a range of profiles, with common arc sections and make up pieces.
d. Cast in a single pour.
e. Shutter suitable for pours ~10m in length. Adaptable for make-up pours
f. Formwork to be carriage mounted and hydraulically operated.
g. Secondary lining invert will have previously been cast flat.
h. Secondary lining thickness of ~350mm
i. Facing material suitable for up 20no. of pours, with no access to clean or oil, whilst still providing F2 finish.
j. Required for April 2023
3) Euston SCL Tunnels
a. Secondary lining shutters to facilitate the construction of
i. both the Upline and Down Crossover tunnels concurrently (2no complete sets of panels and carriages required) ,internal dimensions ~10m diameter.
ii. Cavern crossover of varying sizes (15m, 13m and 11m), formwork to be adaptable for a range of profiles with common arc sections and make up pieces where possible.
b. Cast in a single pour.
c. Shutter suitable for pours ~10m in length. Adaptable for make-up pours
d. Formwork to be carriage mounted and hydraulically operated.
e. Secondary lining invert will have previously been cast flat.
f. Secondary lining thickness of ~350mm
g. Facing material suitable for up 35no. of pours, with no access to clean or oil, whilst still providing F2 finish.
h. Required for Jan 2024
Following responses to this opportunity, the supply chain will be shortlisted accordingly. Those that are successful will be invited to prequalify in order to receive a tender enquiry for the subcontract works. Prequalification will consist of 'business assurance', which will focus on the supply chain's capability, competence and capacity to work with SCS JV, as well as technical assurance which provides an opportunity to assess the supply chain's ability to carry out the subcontract works in question. It is likely that this has been classified as a 'high-risk' package (to be confirmed), whereby the 'business assurance' element of prequalification may be satisfied if the supply chain partner holds one of the Common Assessment Standard (CAS) accreditations, namely:
- Achilles Building Confidence (with Site Audit),
- Constructionline Platinum, or
- CHAS Premier (CAS) Assured (and not CHAS H&S, for example).
Further to a tender process, final selection will be based upon a balanced scorecard assessment. The criteria of this assessment will consider commercial, technical and qualitative (e.g. health and safety, quality, environment and sustainability, etc.) evidence provided by the tenderers.
SCS JV is an unincorporated joint venture between Skanska Construction UK Limited ("Skanska"), Costain Limited ("Costain") and STRABAG AG ("STRABAG") working on behalf of HS2 to deliver the main civil engineering works for the S1 and S2 sectors of HS2 Phase One. The Early Contractor Involvement (ECI) stage of the contract, where SCS JV was developing a scheme design, programme and target cost to deliver the detailed design and construction phase of the project, is now complete, whereby a Notice to Proceed to Stage Two (detailed design and construction) was issued on 15th April 2020. Not only have the individual companies delivered high-speed rail, major infrastructure and some of the most iconic structures internationally, SCS JV also has a proven record of working together. Skanska and Costain have a long history of successfully delivering civil engineering projects together in the UK, dating back 30 years. In joint venture they have delivered many major infrastructure projects, including the M25 in the 1980s, High Speed 1 in the early 2000s and the current Crossrail endeavour, shortly coming to completion under the streets of London. STRABAG and Skanska have worked together for over 15 years on European projects in Switzerland, Slovakia and Norway. As a joint venture, we are bringing together our collective strength to deliver world-class engineering, contributing to the long-term economic growth of local and international markets. This is perfectly encapsulated in our mission; to draw everyone together to create a strong foundation from which to launch a transformative legacy.
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=58530186
- Tender notice
- Please follow this link to view the notice.
About the buyer
Contact name
Procurement Team
Address
Victoria House, Bloomsbury Square
London
WC1B 4DA
UK
Telephone
07392092055
Share this notice