Published date: 5 August 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Works for complete or part construction and civil engineering work - 45200000
Location of contract
United Kingdom, Isle of Man, Channel Islands, British Oversea Territories, Europe, Rest of the World
Value of contract
£501,000
Procurement reference
C4A62471206
Published date
5 August 2022
Closing date
27 May 2022
Closing time
5pm
Contract start date
4 July 2022
Contract end date
31 July 2022
Contract type
Works
Procedure type
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
o Site clearance to Areas A, B & C for the installation of working platforms, haul roads and site welfare including management and disposal of all waste generated from site.
o Surface vegetation clearance (de-veg) to enable access to permanent and temporary works locations.
o Removal of minor underground obstructions and foundations as required.
o Installation of ducting, pipework and drainage to and from the welfare facilities for the provision of power / services and removal of waste and foul water.
o Installation of small concrete bases for site survey control set up works.
o Excavation/trimming of existing ground for installation of working platforms in areas A-C as per attached presentation slides.
o Installation of Pile mat/crane platform to Areas A, B & C. The subcontractor is to assume 400mm of 6F2 with 2 layers of geogrid.
o Installation of haul/access roads from the main compound down to the satellite site access following the alignment of the reception line. Existing ballast is to be removed and replaced with a designed haul road. The subcontractor is to assume 300mm of 6F2 with 2 layers of geogrid.
o Installation of compound hardstand area including foundations for welfare cabins and concrete footpaths. Subcontractor is to assume 2No. units double stacked (2x1x2)
Suppliers will be required to have Constructionline Gold verification.
If shortlisted, suppliers will be required to complete our internal PQQ form.
The bids will be scored with a balanced scorecard approach that includes scoring on experience, resource, sustainability, health & safety, quality, and social value amongst other elements.
VolkerFitzpatrick (VF) is the engineering and construction branch of the VolkerWessels Group, one of the leading engineering and construction companies in the UK. VolkerFitzpatrick have undertaken numerous major infrastructure projects across the UK such as HS2, Wembley Olympic Way, Stansted Airport, Brent Cross West Station and RAF bases Lossiemouth and Lakenheath.
This overall project is working for BBVS JV at the Old Oak Common Station site. VF are undertaking the bridge demolition and replacement for the bridges over Old Oak Common Lane and the Central Line. VF will also be doing the temporary and permanent road lowering at Old Oak Common Lane. The overall programme is 2022-2028, to be done in 3 stages.
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=62471208
- Tender notice
- Please follow this link to view the notice.
Award information
Awarded date
5 August 2022
Contract start date
4 July 2022
Contract end date
31 July 2022
Total value of contract
£0
This contract was awarded to 1 supplier.
Address
Reference
None
About the buyer
Contact name
Jack Starmer
Address
Hertford Road
Hoddesdon
EN119BX
UK
Telephone
07392092056
Share this notice
Closing: 27 May 2022, 5pm