Contract summary

Industry

  • Culvert elements - 44132000

  • Culverts - 45221220

Location of contract

West Midlands

Value of contract

£100,000 to £500,000

Procurement reference

BIP469543126

Published date

3 February 2020

Closing date

6 March 2020

Contract start date

15 June 2020

Contract end date

10 July 2020

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

Deans Culvert is a single span brick pipe culvert with concrete faced headwall and
training wall to the upstream end, there are no wingwalls / headwall to the downstream
end. There are no parapets to this structure, however there is a well-established hedge
adjacent to the carriageway (note:- this hedge has been cleared for access and
replaced with a temporary timber fence as shown on Drawing 62240651-T-103). The
structure is situated under the B4373 which is south of Broseley at National Grid
Reference SJ 680 003.
The culvert was monitored as part of a BD79 inspection regime, on a monthly basis
until May 2012, and then annually until March 2017, to assess movement to the
existing cracks and the shape of the culvert. There was found to be no significant
changes in the readings and repairs were undertaken in early 2014, comprising of
pointing radial cracks and infilling any voids. Some of the pointing has exhibited
hairline cracking and there is a transverse crack to the soffit of the crown running from
the downstream end into the culvert by around 8m. The culvert also exhibits a "sag" in
the invert of around 250mm. Shropshire Council have now requested a liner be
installed, but without reduction to the culverts capacity.
The proposed works include: -
 Implementation, maintenance and removal of traffic management system;
 Construction of temporary access to the upstream end of the culvert;
 Excavation of the carriageway to accommodate a 300mm diameter overpumping
pipe;
 Reinstatement of carriageway once the pipe is installed;
 Site Clearance;
 Damming and temporary diversion of the watercourse (pumping) to create a
dry working environment through the culvert;
 Installation of concrete to the underside and front of the downstream invert;
 Placing of 350mm - 500mm diameter stone to the invert at the downstream
end of the structure;
 Installation of Cured in Place Pipe (CIPP) liner.
 Grout to void areas behind the new CIPP liner.
 Erection of a timber fence to the upstream and downstream verge directly
above the culvert;
 Provision of new hedgerow
 Erection of a new timber gate to the upstream access.
 Removal of the temporary access and making good site.

Planned start date 15 June 2020 and planned finish date 10 July 2020


More information

Links

Additional text

The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.


About the buyer

Contact name

Procurement

Address

Shirehall
Abbey Foregate
Shrewsbury
SY2 6ND
UK

Telephone

+441743252993

Email

procurement@shropshire.gov.uk