Published date: 29 June 2020
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Road construction works - 45233120
Location of contract
South West
Value of contract
£2,600,000
Procurement reference
DVNCC001-DN444048-04451129
Published date
29 June 2020
Closing date
18 May 2020
Contract start date
6 June 2020
Contract end date
1 April 2021
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The overall objective of this scheme is to improve the accessibility of the A379 for all type of users: pedestrians, cyclists and motorists, between the Devon Hotel roundabout and the Sannerville Way roundabout, Exeter, prior to major development planned to the south west of Exeter. (UK Ordnance Survey grid reference SX 93217 89154). At present, this section of the A379 is a 4-lane single carriageway with limited facilities for pedestrians/cyclists. There are no crossing facilities near the Sannerville Way roundabout and a narrow shared use path on the south side of this road. The proposal seeks to introduce a new toucan crossing on the approach to the Sannerville Way roundabout to connect the south side of the A379 with the existing shared use path on Bridge Road and Matford Marsh. The existing shared use path on the A379 will also be widened where possible. Furthermore, a new signalised junction will be created with a new side road to the south of the A379 which will provide access to the proposed development area. The elements of work included in this phase of the scheme are, but not limited to: • Site Clearance • Earthworks • Drainage Works • Introduction of a staggered toucan crossing. • Modification and widening, where possible, of the existing shared use paths. • Realignment of the carriageway. • Resurfacing of the carriageway. • Road markings and signage. • Introduction of a new signalised junction. • Introduction of a new side road with shared paths and a staggered toucan crossing. • Removal of a layby. • Vehicle Restraint System Barriers • Street lighting electrical works. • Landscaping works.
Bidders should be aware from the outset that the maximum budget available for this contract is £2.6m. Bidders who submit a bid over this amount will be rejected.
The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.supplyingthesouthwest.org.uk Tenders or requests to participate must be submitted electronically via: http://www.supplyingthesouthwest.org.uk. Time limit for receipt of tenders or requests to participate: Date: 18/05/2020 Local time: 12:00
More information
Previous notice about this procurement
CP1828A-19 SW Exeter HIF - A379 Eastern Junction
- Opportunity
- Published 23 April 2020, last edited 23 April 2020
Additional text
-
The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.supplyingthesouthwest.org.uk Tenders or requests to participate must be submitted electronically via: http://www.supplyingthesouthwest.org.uk. Time limit for receipt of tenders or requests to participate: Date: 18/05/2020 Local time: 12:00
Award information
Awarded date
24 June 2020
Contract start date
25 June 2020
Contract end date
31 March 2021
Total value of contract
£2,163,841
This contract was awarded to 1 supplier.
Alun Griffiths (Contractors) Ltd.
Address
NP7 9PE
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Contact name
Simon Richardson
Address
County Hall, Lucombe House
Topsham Road
Exeter
EX2 4QD
United Kingdom
Telephone
+44 1392383000
Website
Share this notice
Closing: 18 May 2020