Published date: 14 December 2021

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 11 September 2020, 12pm

Contract summary

Industry

  • Construction work - 45000000

Location of contract

North West

Value of contract

£3,989,544.93

Procurement reference

tender_241757/1023156

Published date

14 December 2021

Closing date

11 September 2020

Closing time

12pm

Contract start date

4 January 2022

Contract end date

15 June 2023

Contract type

Works

Procedure type

Call-off from a framework agreement

A mini-competition or direct purchase from a pre-established framework agreement.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

HV&LV Cable Replacement (BPRN: 1157) - OBC Option 4 (Full Replacement of all HV and LV Cables, Install New Substation and re-configure LV Infrastructure); EIB approval 11/09/2012. Although recent developments have included the installation of a new electrical generator and supporting switchgear, large parts of the electrical infrastructure are reliant on cabling and equipment which forms part of the original installation and is believed to be circa 30/40 years old. The project was initiated because the failure of the HV supply cable to Workshop Substation led to further concerns not only with the integrity of this HVs supply but also with parts of the LV site-wide infrastructure which comprise of cabling of a similar age and construction. It is essential that the deteriorated HV & LV cabling is replaced to maintain a high integrity supply across the site and to the Workshops, which are essential to the Establishment's activity programme.
Install Catch Pit & Associated Works (BPRN: 1138) - OBC Option 4 (Install Catchment Pit & Auto Screening System outside the Prison Boundary plus Replacement of Macerator with Bypass at Atherton Unit (E & F Wings)); EIB approval of Option 4 16/01/2020. There are major issues and risks relating to the existing sewerage system at HMP Long Lartin, concerning waste material and debris in the Establishment's foul sewerage flows being discharged into the public / STWA sewerage network and causing significant damage to assets. The fundamental business need is to ensure the continued operations and security of residential capacity of the Establishment, by ensuring the sewerage system is fit for purpose and can perform effectively under normal operating conditions, additionally eliminating the operational, financial and reputational risks related to Severn Trent Water Authority issuing fines on a six-monthly basis and/or pursuing legal prosecution at any time against HMP Long Lartin.


Award information

Awarded date

7 December 2021

Contract start date

4 January 2022

Contract end date

15 June 2023

Total value of contract

£3,989,544.93

This contract was awarded to 1 supplier.

Vinci Construction UK Ltd

Address

WD24 4WW

Reference

No reference - other

Supplier is SME?

No

Supplier is VCSE?

No